Document from CIS Legislation database © 2003-2025 SojuzPravoInform LLC

RESOLUTION OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN

of June 20, 2018 No. PP-3789

About measures for enhancement of activities of Research institution of irrigation and water problems and strengthening of material and technical resources of the Tashkent architectural and construction institute

(as amended of the Presidential decree of the Republic of Uzbekistan of 08.07.2022 No. UP-167)

According to the resolution of the President of the Republic of Uzbekistan of May 8, 2018 No. PP-3702 "About measures for radical enhancement of system of training with the higher education at the Tashkent institute of engineers of irrigation and mechanization of agricultural industry", and also for the purpose of ensuring strengthening of material and technical resources of Research institution of irrigation and water problems and the Tashkent architectural and construction institute taking into account modern requirements:

1. Take into consideration that No. PP-3702 "About measures for radical enhancement of system of training with the higher education at the Tashkent institute of engineers of irrigation and mechanization of agricultural industry" the Research institution of irrigation and water problems is removed by the resolution of the President of the Republic of Uzbekistan of May 8, 2018 from structure of the Tashkent institute of engineers of irrigation and mechanization of agricultural industry.

2. Transfer Research institution of irrigation and water problems to structure of the Ministry of water economy of the Republic of Uzbekistan.

3. Agree with offers of the Ministry of water economy, the Ministry of construction, the Ministry of Economic Development and reducing poverty, the Ministry of the higher and secondary vocational education of the Republic of Uzbekistan, Agency on management of the state assets, khokimiyat of the city of Tashkent and O LLC zbeko "quvavtomatika" about transfer:

a) To research institution of irrigation and water problems on the right of operational management of buildings and constructions, at the address: Tashkent, Mirzo Ulugbeksky the area, array of Karasu-4, 11, with the adjacent territory which are earlier transferred to institute Tashkent architectural construction;

b) To institute Tashkent architectural construction on the right of operational management:

Document in demo-mode!

Full text is available after subscription.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.