Document from CIS Legislation database © 2003-2026 SojuzPravoInform LLC

RESOLUTION OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN

of July 1, 2024 No. PP-241

About measures for enhancement of the operating mechanisms of ensuring content in proper condition roads and road infrastructure, and also improvement of the territories

In the republic system work on improvement of highways, covering as asphalt of internal streets and construction of modern walking paths is carried out, 15 trillion 295 billion sum, including 1 trillion 271 billion sum - on the Initiative Budget project are allocated for these purposes only in 2023.

At the same time lack of effective mechanisms on providing and control of content in proper condition of roads creates conditions for increase in the facts of uncontrolled destruction of asphalt covering and sidewalks on places, and also their leaving without recovery of former condition.

For the purpose of preserving the roads and road infrastructure which are common property, giving of modern look to the cities and other settlements, and also increase in responsibility of citizens and legal entities in this direction:

1. To especially note that in the Republic of Uzbekistan each citizen and the organization bear equal responsibility along with state bodies and the organizations for content in purity makhally, streets and roads, villages, areas and the cities, preserving the infrastructure which is available in them, gardening of the territories.

2. Agree with the offer of the Ministry of Internal Affairs, Ministry of transport and Association makhally Uzbekistan about implementation since September 1, 2024 of the following procedure by enhancement in accordance with the established procedure of the current legislation:

carrying out by physical persons and all legal entities irrespective of their pattern of ownership of construction works on roads, sidewalks and other objects of road infrastructure (further - road objects), their repair, destruction, unearthing, change or reconstruction in any form (further - construction repair work) are carried out only after receipt of the corresponding permission;

the state services in registration and issue of permission appear through the centers of the state services and the Single portal of interactive state services in five-day time;

Document in demo-mode!

Full text is available after subscription.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.