Document from CIS Legislation database © 2003-2026 SojuzPravoInform LLC

RESOLUTION OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN

of July 12, 2024 No. PP-252

About acceleration of measures for reforming of the hydroenergy sphere

(as amended of the Resolution of the President of the Republic of Uzbekistan of 25.12.2024 No. PP-455)

For the purpose of stable providing with energy resources the population and industries of economy, reducing consumption of natural gas in case of production of electrical energy, and also effective use of capacity of the hydroenergy sphere:

1. Agree with offers of the Department of Energy, the Ministry of investments, the industry and trade and JSC Uzbekgidroenergo (further - Society) about bringing until the end of total 2028 of capacity of hydroelectric power stations to 5508 MW, including construction of total pumped storage power plants capacity of 1600 MW.

2. Approve the Program of measures for further development of the hydroenergy sphere for 2024 - 2028 (further - the Program) providing:

The list of the investment projects of construction of total hydroelectric power stations realized by JSC Uzbekgidroenergo capacity of 1018 MW according to appendix No. 1 *;

"Road map" on projects implementation of construction of total hydroelectric power stations capacity of 449 MW with attraction of foreign secured loans of the Republic of Uzbekistan in 2024 according to appendix No. 1a *;

The list of summary investment projects capacity of 2275 MW implemented with participation of private investors in the hydroenergy sphere according to appendix No. 2*.

3. Form the Republican commission on development of the hydroenergy sphere (further - the Republican commission) in structure according to appendix No. 3*.

(A. Aripov) to provide to the republican commission:

timely development of the raised funds of the international financial institutions and other organizations, and also attraction of direct investments for implementation of the investment projects determined by the Program;

timely development of the preproject documentation, and also commissioning of the investment projects provided by the Program, at the scheduled time;

localization of equipment manufacturing and the spare parts necessary for construction and operation of hydroelectric power stations, and also implementation of their step-by-step production by industrial cooperation;

Document in demo-mode!

Full text is available after subscription.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.