On February 12, 2002 No. 22-02
of January 29, 2002 No. 36
About approval "Service regulations and approval of construction of sidings"
According to the Charter of the railroad of the Kyrgyz Republic approved by the order of the Government of the Kyrgyz Republic of 02.06.2000 No. 315 I order:
1. Approve the enclosed "Service regulations and approval of construction of sidings".
2. "About approval of rules of construction and operation of sidings" to consider the order No. 339 of 10.10.2001 invalid.
3. To the head of department of the Kyrgyz railroad Omurkulov I. Sh. perform state registration of the specified Rules in the Ministry of Justice of the Kyrgyz Republic and accept to management and execution.
Minister K. Zhumaliyev
It is registered
in the Ministry of Justice
Kyrgyz Republic
On February 12, 2002 No. 22-02
Approved by the order of the Ministry of Transport and Communications of the Kyrgyz Republic of January 29, 2002 No. 36
The adjunction of railroad side tracks to railway tracks public is allowed by executive body in the field of rail transport or according to its order the chief of the railroad in coordination with local government bodies.
The construction and reconstruction of railroad side tracks, and also the devices intended for loading, unloading and cleaning of cars are made in coordination with the railroad of adjunction, and in case of amount of transportation of goods of 5 million tons and more in year - with state body of the executive authority in the field of rail transport. The construction of new railroad side tracks is approved also with relevant organs of local self-government.
The design and condition of trackage layouts and technical constructions of railroad side tracks shall conform to requirements of construction regulations and rules and to provide the omission of cars with regulation of technical loading, admissible on railway tracks public, and when servicing railroad side track by engines of the railroad - the omission of the locomotives allocated for this purpose with the railroad.
Railroad side tracks of the organizations can be transferred under the agreement to the railroad, including to their maintenance.
(article 52 of the Charter of the railroad of the Kyrgyz Republic)
1.1. The ways intended for servicing of the separate companies, organizations, organizations and legal entities, connected with general network of roads continuous rail track and belonging belong to railroad side tracks:
a) to the companies, the organizations, organizations which are hereinafter referred to as with "vetvevladelets";
b) to the railroad which is hereinafter referred to as "road";
c) to the railroad, and the railway warehouses, pogruzochnorazgruzochny platforms, mechanisms, etc. belonging to the companies, the organizations, organizations, which are hereinafter referred to as "company";
d) the sidings of the companies, organizations, organizations adjoining siding of vetvevladelets - "partners".
The procedure for servicing of such ways is determined by the agreement signed directly between vetvevladelets and the partner.
1.2. The adjunction of railroad side tracks to railway tracks public permits:
a) to the main ways on stages - the Minister of Transport and Communications of the Kyrgyz Republic;
b) to station ways - the head of department of the railroad;
c) to sidings - vetvevladelets.
All permissions are approved with bodies of public administration and local self-government.
1.3. The border of siding is determined "By the instruction about procedure for giving, cleaning of cars and to production of shunting work on siding".
1.4. The land areas occupied with sidings, warehouses and constructions of the companies, organizations, organizations within strip of branch are provided to them in temporary use according to the legislation of the Kyrgyz Republic.
On this land area the construction of capital buildings and constructions without written consent of Management of the Kyrgyz railroad is forbidden.
The border of strip of branch is determined in accordance with the established procedure according to documents of title.
Transfer of land areas to temporary use is drawn up by the agreement according to the legislation of the Kyrgyz Republic and signed by Management of the Kyrgyz railroad and the director, the organizations, organizations using the site.
1.5. Use of siding or its part, the railroad for production of shunting works, statements of railway vehicles and other purposes can be made by the railroad after obtaining by the station commander on it written consent of vetvevladelets.
1.6. The railroads can lease at the request of the companies, the organizations, organizations it railway tracks which after transfer to rent use under the terms of operation are equated to the sidings belonging to vetvevladelets.
1.7. Only the specialized organization having the right to production of these works shall make repair of sidings.
If repair is made by forces of vetvevladelets, the distance of way of UKZhD shall exercise control.
On production of these works the relevant agreement is constituted.
1.8. With the linear companies of Management of the Kyrgyz railroad, the having sidings of relation are determined according to the order of Management of the Kyrgyz railroad.
In these rules references to the following regulating documents are used:
Charter of the railroad of the Kyrgyz Republic, 2000.
MSN 3.03.01-95. Interstate construction regulations of the railroad of track of 1520 mm.
Construction Norms and Regulations of the KR 12-03-00. Acceptance for operation finished with construction of facilities. Basic provisions.
3.1. In these rules the following terms with the corresponding determinations are used:
The consignor - any person, with which or from name, or from the face which the contract with the railroad for cargo hauling, or any person who hands over or from the face, or on behalf of whom the load actually is given to the railroad on transportation is signed.
The consignee - person authorized on receipt of load.
Railway tracks public - rail lines on which the railway stations open for accomplishment of the corresponding transactions on acceptance and departure of trains, receiving and delivery of loads, cargo baggage and baggage, servicing of passengers, production of shunting work are located.
Railroad side track - the railway track connected with general network of the railroads continuous rail track and intended for servicing of certain consignors, consignees.
Places public - the warehouses (covered and opened), located in the territory of the railway station, belonging to the railroad and used for loading, unloading, sorting, storage of loads of any consignors, consignees.
Places of uncommon use - the warehouses (covered and opened), the parcels of land which are not belonging to the railroad or leased by the railroad, located both beyond limits, and in the territory of the railway stations and used for the materials handling operations connected with rail hauling of loads and cargo baggage of certain consignors, consignees.
The collection of rules of transportation of goods - the official periodical in which regulations in the field of transportation of goods of the executive authority by state body in the field of rail transport within the competence according to this Charter are published.
Charges - the price rates provided in tariff managements not included in rates which sizes and procedure for application are determined according to the legislation of the Kyrgyz Republic.
Dual transaction - use by the consignor of the car (container) unloaded by it for loading of load.
Branch strip - the earth of rail transport, occupied by road bed, artificial constructions, linearly - traveling and others, buildings, devices of railway communication, railway stations protection, forest shelter and trackage layouts, and also the lands allocated or reserved by the state for future development of rail transport.
Movement safety - the activities of bodies of rail transport, the government and local self-government of the companies, organizations, organizations directed to smooth functioning of rail transport and non-admission of emergence of emergencies in transportation process and also on decrease in effects of possible accidents.
Limiting column - the permanent alarm sign specifying the place, further whom it is impossible to establish railway vehicles in the direction of the railroad switch.
The index of traveling obstacle is established on emphasis on the right end of bar and gives evidences towards way.
Reconstruction of siding - the works caused by growth in volumes of transportations on siding, requiring its traveling development, warehouse economy, etc.
3.2. The documents concluded by the railroad and vetvevladelets.
The agreement - the legal document determining railroad relation with the company, the organization, organization on operation of siding.
The contract for giving and cleaning of cars - when servicing vetvevladelets and the partner the engine of the railroad.
The instruction on giving and cleaning of cars and to production of shunting work in which the border of siding, speed of shunting movements, the plan and profile of railway tracks is determined in case of production of shunting work with the established speed and other data.
The provisional agreement - on giving and cleaning of cars on railroad side tracks under construction.
The act of inspection - the joint document with vetvevladelets constituted by the commission before the conclusion of the contract for operation of siding.
4.1. The construction (reconstruction) of railway tracks of the companies, organizations, organizations, (legal entities or physical persons) with adjunction to the existing, under construction and designed ways of the road and sidings of the companies at which the railway vehicles of the railroads of the State Parties of the CIS address of Latvia, Lithuania, Estonia can be performed only on projects, coordinated management of the Kyrgyz railroad.
Projects shall be developed according to requirements, the operating Interstate construction regulations the MSN 3-03.01-95 "The railroads of track of 1520 mm".
4.2. Consideration of project materials of railroad side tracks is made by engineering office of ferry service and commercial work with participation of all interested services and departments of Management of the railroad.
4.3. Approval of the project of railroad side tracks is made in Management of the Kyrgyz railroad after payment by vetvevladelets according to calculation.
4.4. Approval of project materials of railroad side tracks and issue of notes on them in services (economic units) is assigned to the chief engineer of Management of the railroad.
4.5. In case of approval of project materials of railroad side tracks it is necessary to provide the following data:
4.5.1. Permission of city and district Keneshes to right to use by the parcel of land according to the current legislation about land use.
4.5.2. The written consent of vetvevladelets to adjunction and servicing of new siding (in case of its adjunction to the existing siding).
4.5.3. The made decisions on devices for cleaning of cars after unloading, to dosing and weight devices with the corresponding calculations of their capacity.
4.5.4. About projectible devices of power supply, STsB and communication, locomotive, car, traveling and other farms.
4.5.5. Decisions on providing production sanitation, fire and ecological safety.
4.6. The adjunction of again under construction railroad side tracks is made, as a rule, to freight stations of the road.
4.7. The adjunction of railroad side tracks to the separate Items closed for cargo operations or which are carrying out them on special conditions shall be proved by technical and economic calculations. The final decision on possibility of such adjunction of sidings is made by the chief of the road.
4.8. The adjunction of siding shall not allow when giving and cleaning cars of crossing of the main ways and extracts.
4.9. Consideration of projects of sidings shall be made in the following terms:
- in Management of the road - no more than 10 days from the moment of receipt of the project;
- in service (department) of Upravleniya Doroga - no more than 5 days.
4.10. Registration of approval of working drawings of STsB devices and bonds transferred to fixed assets of the railroad is assigned to distance of the alarm system and communication.
4.11. Projects of sidings are subject to reapproval:
- in case of expiration of earlier issued approval if the construction is not begun within year and the request about prolongation of term did not arrive;
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.