of July 9, 2010 No. 163
About permission of accomplishment of construction works
The Parliament adopts this organic law.
(1) Subject of this law is the regulation of procedure for permission, approval and verification of project works, construction or demolition of structures and elements of arrangement according to documentation on town planning and arrangement of the territory, using system of regulating documents in construction for ensuring transparency and publicity in case of issue of administrative acts and creating favorable conditions for entrepreneurship.
(2) Provisions of this law are obligatory for receipt of the permission for construction of constructions of any kind, category, appointment and type of property, except for constructions on military or secret sites and diplomatic representations of foreign states in the Republic of Moldova for which special permission is drawn up.
For the purpose of this law the following basic concepts mean:
the chief architect - the head of local body of architecture and town planning appointed to position in accordance with the established procedure;
the construction license – the act issued by the issuer who allowed accomplishment of construction works on the basis and with observance of conditions of the town-planning certificate for designing and the developed and checked project documentation;
permission to demolition - the act issued by the issuer who allowed performance of works on complete or partial demolition of structure/element of arrangement;
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.
The document ceased to be valid since January 30, 2025 according to article 390 of the Town-planning and construction code of the Republic of Moldova of December 28, 2023 No. 434