RESOLUTION OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN

of April 4, 2012 No. PP-1735

About the organization of construction of facilities of external infrastructure of the Ustyurt gas-chemical complex

For the purpose of acceleration of construction of facilities of external infrastructure taking into account the set capacity of the Ustyurt GCC and second priority of the Kungradsky soda plant:

1. Take into consideration that according to the signed investment agreements and contracts on a turnkey basis within the organization of construction of infrastructure facilities of the Ustyurt GCC by joint business "Uz-Kor Gas Chemicab at the expense of own means are performed:

creation of necessary infrastructure of the field Surgil, including construction of the gas pipeline and condensate drain line 112 km long to the technological platform of the Ustyurt GCC, highways, utility power systems, water treatment and water supply, and also the field camp;

highway construction from the technological platform of the Ustyurt GCC to Highway A-380 5 km long and access rail line to the Kyrkkyz station 9 km long;

installation of three gas turbines on production of electricity by general capacity of 105 MW from whom to 25 MW it will be transferred to Uzbekenergo SAC network on contractual basis.

2. Approve the offer of the Ministry of Economics, Ministry of Finance of the Republic of Uzbekistan, NHK "Uzbekneftegaz" and the Uzkommunkhizmat agency on construction in 2012-2015:

conduit of technical Takhiatash-Kungrad water 101 km long, including water intake capacity 50 тыс.куб.м / days around the Takhiatashsky water-engineering system, taking into account expansion of the Kungradsky soda plant;

conduit of technical water "Kungrad-Ustyurtsky GCC" 49 km long, including the raising pumping point capacity 50 тыс.куб.м / days around of Kungrad;

artificial reservoir of the reserve water supply in amount at least 2 million cubic meters adjoining the technological platform of the Ustyurt GCC including pumping point and conduits.

paid document

Full text is available with an active Subscribtion after logging in.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.