of April 20, 2014 No. 83-FZ
About introduction of amendments to article 23.2 of the Federal law "About Power Industry"
Accepted by the State Duma of the Russian Federation on April 4, 2014
Approved by Council of the Russian Federation on April 16, 2014
Bring in Item 2 of article 23.2 of the Federal Law of March 26, 2003 No. 35-FZ "About power industry" (The Russian Federation Code, 2003, No. 13, Art. 1177; 2010, No. 31, Art. 4156; 2011, No. 50, Art. 7336; 2013, No. 45, Art. 5797) following changes:
To add 1) with new paragraphs the fifth and sixth the following content:
"Since October 1, 2015 the size the maximum capacity of no more than 150 kW of investment component included in payments for technological connection of power receiving devices in structure on covering of construction expenses of objects of electric grid economy - from the existing objects of electric grid economy to the attached power receiving devices and (or) power generation facilities cannot constitute more than 50 percent from the size of the specified expenses.
Since October 1, 2017 the structure of payment for technological connection of power receiving devices the maximum capacity of no more than 150 kW does not join the expenses connected with construction of facilities of electric grid economy - from the existing objects of electric grid economy to the attached power receiving devices and (or) power generation facilities.";
To add 2) with paragraphs the seventh and eighth the following content:
"At the same time construction expenses of objects of electric grid economy - from the existing objects of electric grid economy to the attached power receiving devices and (or) power generation facilities, no more than 150 kW who are not considered since October 1, 2015 as a part of payment for technological connection of power receiving devices by the maximum capacity, according to pricing bases in the field of regulated prices (rates) in power industry join in the expenses of the network organization considered in case of establishment of rates for services in transfer of electrical energy.
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.