of June 11, 2015 No. 588
About modification of the Order of the Government of the Russian Federation of December 27, 2004 No. 861
The government of the Russian Federation decides:
Approve the enclosed changes which are made to the order of the Government of the Russian Federation of December 27, 2004 No. 861 "About approval of Rules of non-discriminatory access to services in transfer of electrical energy and rendering these services, Rules of non-discriminatory access to services in supervisory control in power industry and rendering these services, Rules of non-discriminatory access to services of Trading System Administrator of the wholesale market and rendering these services and Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons to power networks" (The Russian Federation Code, 2004, No. 52, Art. 5525; 2009, No. 17, Art. 2088; No. 25, Art. 3073; 2010, No. 40, Art. 5086; 2011, No. 10, Art. 1406; 2012, No. 23, Art. 3008; No. 41, Art. 5636; No. 49, Art. 6858; 2013, No. 33, Art. 4392; No. 42, Art. 5373; No. 44, Art. 5765; 2014, No. 7, Art. 689; No. 9, Art. 913).
Russian Prime Minister
D. Medvedev
Approved by the Order of the Government of the Russian Federation of June 11, 2015 No. 588
1. Item 2 of Rules of non-discriminatory access to services in transfer of electrical energy and rendering these services approved by the specified resolution to add with the paragraph of the following content:
"power receiving devices of the consumer" - the devices which are at the consumer, aggregates, mechanisms, devices and other equipment (or their complex) intended for transformation of electrical energy to other type of energy for the purpose of use (consumption) and having among themselves electric bonds.".
2. In Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons, to power networks, approved by the specified resolution:
a) in the subitem "d" of Item 7 of the word to "appendix No. 6" shall be replaced with words to "appendix No. 1", to "appendix No. 7" shall be replaced with words words to "appendix No. 2", to "appendix No. 8" shall be replaced with words words to "appendix No. 3";
b) the paragraph one of Item 8 to add with the offer of the following content: "The request goes in forms according to appendices No. 4 - 7 in any manner of its giving (mail or with use of the official site of the network organization).";
c) to state the subitem "e" of Item 9 in the following edition:
"e) the declared category of reliability of power receiving devices;";
d) to state paragraph two of Item 13 in the following edition:
"the data provided by subitems "an" - "in" and "l" of Item 9 of these rules;";
e) in Item 15:
word in paragraph seven to "appendix No. 1" shall be replaced with words to "appendix No. 8";
word in paragraph eight to "appendix No. 2" shall be replaced with words to "appendix No. 9";
word in paragraph nine to "appendix No. 3" shall be replaced with words to "appendix No. 10";
word in paragraph ten to "appendix No. 4" shall be replaced with words to "appendix No. 11";
word in paragraph eleven to "appendix No. 5" shall be replaced with words to "appendix No. 12";
e) ceased to be valid according to the Order of the Government of the Russian Federation of 07.05.2017 No. 542
g) add Item 34 with the paragraph of the following content:
"The agreement on redistribution of the maximum capacity is signed in form according to appendix No. 14.";
h) in paragraph one of Item 88 of the word to "appendix No. 10" shall be replaced with words to "appendix No. 15";
i) appendices No. 1 - 10 to the specified Rules to replace with appendices No. 1 - 15 following contents:
"Appendix No. 1
to Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons to power networks (in edition of the Order of the Government of the Russian Federation of June 11, 2015 No. 588)
ACT
about implementation of technological accession
No. ___________ from "__" _________ 20 __.
___________________________________________________, hereinafter referred to as
(full name of the network organization)
the network organization, on behalf of _____________________________________________,
(surname, name, middle name of person - the representative
network organization)
acting on the basis of the ________________________________________________,
(charter, power of attorney, other documents)
on the one hand, and _______________________________________________________,
(full name of the applicant - the legal entity;
surname, name, the applicant's middle name - physical person)
hereinafter referred to as with the applicant, on behalf of _________________________________
__________________________________________________________________________,
(surname, name, middle name of person - the applicant's representative)
acting on the basis of the ________________________________________________,
(charter, power of attorney, other documents)
on the other hand, hereinafter referred to as by the parties, drew up and
signed this act as follows.
The network organization rendered to the applicant service in technological
to connection of power receiving devices (power plants)
the applicant according to actions for the agreement on implementation
technological accession from ___________ No. _____ in full on
the amount of __________________ (______________________) of rubles ____ kopeks, in that
(in cursive script)
number of the VAT of _________ (____________________) of rubles ____ kopeks, executed
(in cursive script)
on specifications from _______________ No. ________.
The act of accomplishment of specifications from _______________ No. ________.
Characteristics of the executed accession:
maximum capacity ___________ kW;
the cumulative size of rated power attached to electric
networks of kVA _________ transformers.
List of points of accession:
|
Accession point |
The power supply (the name of the feeding lines) |
Description of point of accession |
Level of tension (kV) |
Maximum capacity (kW) |
The size of rated power of the attached transformers (kVA) |
Category of reliability of electric utility service |
Extreme value of coefficient of reactive capacity (tg) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Metering devices (measuring complexes):
|
Accession point |
Metering devices |
Measuring transformers of current |
Measuring transformers of tension | ||||||||
|
Installation site |
Type |
Accuracy class |
Installation site |
Type |
Transformation coefficient |
Accuracy class |
Installation site |
Type |
Transformation coefficient |
Accuracy class | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Devices of protection, relay protection, antiemergency and regime
automatic equipment:
__________________________________________________________________________.
(types of protection and automatic equipment, action, etc.)
Autonomous reserve power supply:
__________________________________________________________________________.
(installation site, type, capacity, etc.)
Other data:
__________________________________________________________________________.
(including data about indirectly the attached consumers,
name, address, maximum capacity, category of reliability, level
tension, etc.)
The parties confirm that technological accession
power receiving devices (power plants) to power network
the network organization it is executed according to rules and regulations.
The applicant of claims on rendering services to the network organization has no.
Signatures of the parties
_______________________________ _______________________________
(position) (position)
______________/________________ ______________/________________
(signature) (first name, middle initial, last name) (signature) (first name, middle initial, last name)
Appendix № 2
to Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons to power networks (in edition of the Order of the Government of the Russian Federation of June 11, 2015 No. 588)
ACT
differentiations of borders of balance sheet accessory of the parties
No. __________ from "__" ________ 20 __.
___________________________________________________, hereinafter referred to as
(full name of the network organization)
the network organization, on behalf of _____________________________________________,
(surname, name, middle name of person - the representative
network organization)
acting on the basis of the ________________________________________________,
(charter, power of attorney, other documents)
on the one hand, and _______________________________________________________,
(full name of the applicant - the legal entity;
surname, name, the applicant's middle name - physical person)
hereinafter referred to as with the applicant, on behalf of _________________________________
__________________________________________________________________________,
(surname, name, middle name of person - the applicant's representative)
acting on the basis of the ________________________________________________,
(charter, power of attorney, other documents)
on the other hand, hereinafter referred to as by the parties, drew up and
signed this act determining borders of balance sheet accessory
electroinstallations of the parties.
Electroinstallations of the parties, concerning which this act
borders of balance sheet accessory are established, are ______________
__________________________________________________________________________.
(address)
The act of technological accession from _______________ No. _________.
Characteristics of accession:
maximum capacity ___________ kW;
the cumulative size of rated power attached to electric
networks of kVA _________ transformers.
List of points of accession:
|
Accession point |
The power supply (the name of the feeding lines) |
Description of point of accession |
Level of tension (kV) |
Maximum capacity (kW) |
The size of rated power of the attached transformers (kVA) |
Category of reliability of electric utility service |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
On border of balance sheet accessory the parties have following
technologically connected elements of power network:
|
Name of electroinstallation (equipment) of the network organization |
Name of electroinstallation (equipment) of the applicant |
|
|
|
|
|
|
Borders of balance sheet accessory of the parties are established:
__________________________________________________________________________.
(description of borders of balance sheet accessory)
Schematically borders of balance sheet accessory of the parties are specified in
to the stated below scheme of connection of electroinstallations.
|
The unilinear scheme of connection of power receiving devices of the applicant to the external network (which is not belonging to the applicant) with the borders of balance sheet accessory of the parties put on the scheme. On the unilinear scheme owners of electroinstallation (equipment) shall be specified, placement of devices of commercial accounting is specified, length and brand of wires (cable), transformer substations with indication of type and capacity of transformers, the compensating devices (reactors of electric power, batteries of static condensers) of power network shall be specified. |
Other:
__________________________________________________________________________.
Signatures of the parties
_______________________________ _______________________________
(position) (position)
______________/________________ ______________/________________
(signature) (first name, middle initial, last name) (signature) (first name, middle initial, last name)
Appendix №. 3
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.