of March 7, 2019 No. 77
About modification and amendments in the order of the Minister of Energy of the Republic of Kazakhstan of February 11, 2015 No. 73 "About approval of Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks"
I ORDER:
1. Introduce the order of the Minister of Energy of the Republic of Kazakhstan of February 11, 2015 No. 73 "About approval of Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks" (it is registered in the Register of state registration of regulatory legal acts for No. 10451, it is published on April 3, 2015 in information system of law of Ad_let) the following changes and amendments:
in Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, the thermal and power networks approved by the specified order:
add with Item 24-1 of the following content:
"24-1. When servicing power networks by the power transferring organization carrying out testing and measurements in power networks which results are entered in sheets of key parameters of technical condition of power networks in forms according to appendices 12, of 13, 14 to these rules is provided.
By results of repair of power networks by the power transferring organization sheets of key parameters of technical condition of power networks in forms according to appendices 12, of 13, 14 to these rules are filled in.";
2, of 3, of 4, of 5, of 6, of 7, of 8, of 9, of 10, 11 to be reworded as follows appendices according to appendices 1, of 2, of 3, of 4, of 5, of 6, of 7, of 8, of 9, 10 to this order;
add with appendices 12, of 13, 14 according to appendices 11, of 12, 13 to this order.
2. To provide to committee of atomic and energy supervision and control of the Department of Energy of the Republic of Kazakhstan in the procedure established by the legislation of the Republic of Kazakhstan:
1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;
2) within ten calendar days from the date of state registration of this order the direction it in the Kazakh and Russian languages in the Republican state company on the right of economic maintaining "The republican center of legal information" of the Ministry of Justice of the Republic of Kazakhstan for official publication and inclusion in Reference control bank of regulatory legal acts of the Republic of Kazakhstan;
3) placement of this order on Internet resource of the Department of Energy of the Republic of Kazakhstan;
4) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Department of legal service of the Department of Energy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 1), 2) and 3) of this Item.
3. To impose control of execution of this order on the supervising vice-Minister of Energy of the Republic of Kazakhstan.
4. This order becomes effective after ten calendar days after day of its first official publication.
Minister of Energy of the Republic of Kazakhstan
K. Bozumbayev
to the Order of the Minister of Energy of the Republic of Kazakhstan of March 7, 2019 No. 77
Appendix 2
to Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks
Form
I claim
Head of the organization
_________________________________________________
(date, signature, surname, name, middle name (in the presence))
The perspective plan of repair of the equipment, buildings and constructions of power plants, power networks with 20 ___ years on 20 ___ year
_____________________________________
(name of the organization)
|
Year |
Name of object |
Repair type (capital, current, list of the main special works, upgrade) |
The planned repair time |
Normative duration |
Equipment service life |
Total cost of repair, thousands of tenges |
Contractor | |||
|
Month of conclusion in repair |
Duration, calendar days |
In the planned repair type |
In running repair within year, calendar days |
From the last capital repairs prior to the beginning of the planned year (hour) |
Since the beginning of operation year (hour) | |||||
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
Technical lead ______________________________________ "_____" ____________ 20 _____ year
Note: the explanatory note in which are proved need of accomplishment of special works, the upgrades specified in the column 3, availability of technical and estimate documentation, requirement in material and manpower is attached to the perspective plan.
to the Order of the Minister of Energy of the Republic of Kazakhstan of March 7, 2019 No. 77
Appendix 3
to Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks
Form
I claim
Head of the organization
________________________________________________
(date, signature, surname, name, middle name (in the presence))
The perspective plan of repair of thermal networks with 20 __ years on 20 __ year
_________________________________________________________
(name of the organization)
|
Year of repair |
Operational area |
The address of the repaired site of thermal network |
Year of commissioning |
Diameter of the pipeline, millimeter |
Site extent, meter |
The planned repair time |
Approximate repair price |
Contractor | |
|
beginning |
termination | ||||||||
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
Technical lead ______________________________________ "_______" ______________ 20 ___ year
to the Order of the Minister of Energy of the Republic of Kazakhstan of March 7, 2019 No. 77
Appendix 4
to Rules of the organization of maintenance and repair of the equipment, buildings and constructions of power plants, thermal and power networks
Form
Power plant _________________________________
The sheet of key parameters of technical condition of steam-turbine installation of the station No. _____ with (producer) ______ turbine, factory No. _________, year of release ________, year of commisioning _________ Steam-turbine installation was under repair
_______________________
(repair type)
with "__" ________ _____ of year to "___" ___________ ____ years
|
|
Parameter of technical condition |
Factory, project or normative data |
Data of operating tests or changes |
Note | ||
|
before capital repairs |
after capital repairs | |||||
|
1. |
General parameters | |||||
|
1) |
the maximum given capacity of the turbine, MW |
|
|
|
| |
|
2) |
vapor expense at the rated power, t/h |
|
|
|
| |
|
3) |
vapor pressure in control step, MPa (kgf/cm 2) |
|
|
|
| |
|
2. |
Vibration (total) bearings, mm / with | |||||
|
1) |
bearing No. 1 |
Vertical |
|
|
|
|
|
2) |
bearing No. 2 |
Vertical |
|
|
|
|
|
3) |
bearing No. 3 |
Vertical |
|
|
|
|
|
4) |
bearing No. 4 |
Vertical |
|
|
|
|
|
5) |
bearing No. 5 |
Vertical |
|
|
|
|
|
6) |
bearing No. 6 |
Vertical |
|
|
|
|
|
7) |
bearing No. 7 |
Vertical |
|
|
|
|
|
8) |
bearing No. 8 |
Vertical |
|
|
|
|
|
9) |
bearing No. 9 |
Vertical |
|
|
|
|
|
10) |
bearing No. 10 |
Vertical |
|
|
|
|
|
11) |
bearing No. 11 |
Vertical |
|
|
|
|
|
12) |
bearing No. 12 |
Vertical |
|
|
|
|
|
13) |
bearing No. 13 |
Vertical |
|
|
|
|
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.