RESOLUTION OF THE CABINET OF MINISTERS OF THE REPUBLIC OF UZBEKISTAN

of July 9, 2019 No. 567

About modification and amendments in some decisions of the Government of the Republic of Uzbekistan (The resolution of the President of the Republic of Uzbekistan of February 5, 2019 No. PP-4160 "About additional measures for improvement of rating of the Republic of Uzbekistan in the annual report of the World Bank and the International Finance Corporation "Vedeniye Businessa")

 According to the Resolution of the President of the Republic of Uzbekistan of February 5, 2019 No. PP-4160 "About additional measures for improvement of rating of the Republic of Uzbekistan in the annual report of the World Bank and the International Finance Corporation "Vedeniye Businessa"", and also in pursuance of the State program on strategy implementation of actions in five priority directions of development of the Republic of Uzbekistan in 2017 - 2021 in "Year of active investments and social development" the Cabinet of Ministers decides:

1. Make changes and additions to some decisions of the Government of the Republic of Uzbekistan according to appendix.

2. To Department of Energy of the Republic of Uzbekistan in a month:

develop and approve procedure according to which data on indexes of average duration of interruption of system operation (SAIDI) and average frequency of interruptions of system operation (SAIFI), including the closing statement on the actual shutdowns, are subject to the quarterly publication on the official website of the ministry and the Portal of open data of the Republic of Uzbekistan;

together with the interested ministries and departments to bring the regulatory legal acts adopted by them into accord with this resolution.

3. To impose control of execution of this resolution on the Minister of Energy of the Republic of Uzbekistan A. S. Sultanov.

Prime Minister of the Republic of Uzbekistan

Abdullah Aripov

Appendix

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of July 9, 2019 No. 567

Changes and additions made to some decisions of the Government of the Republic of Uzbekistan

1. In the List of documents of allowing nature in the field of business activity approved by the resolution of the Cabinet of Ministers of August 15, 2013 No. 225 (the joint venture of the Republic of Uzbekistan, 2013, No. 8, the Art. 55):

a) in the column "Body, Authorized to Issue the Document of Allowing Nature" of line item of the 46th word "GI "Uzgosenergonadzor"" to replace with the word "Uzenergoinspektion";

b) 47 and 48 to exclude line items.

2. In appendix No. 5 to the Regulations on procedure for passing of allowing procedures in the State committee of industrial safety of the Republic of Uzbekistan approved by the resolution of the Cabinet of Ministers of June 6, 2017 No. 360 (the joint venture of the Republic of Uzbekistan, 2017, No. 6, the Art. 95):

a) 14.8 and 14.9 to exclude line items;

b) in Item 1 of the note of the word "subitems 14.7 - 14.8" shall be replaced with words "subitem 14.7".

3. In the resolution of the Cabinet of Ministers of March 31, 2018 No. 256 "About approval of administrative regulations of rendering the state services in connection to engineering and communication networks" (the joint venture of the Republic of Uzbekistan, 2018, No. 3, the Art. 73):

a) in appendix No. 1:

and 5 to state items 4 in the following edition:

"4. The procedure of connection of consumers to power networks provides:

development of specifications (in case of construction of new object it is performed within development of architectural and planning task);

development and approval of the project of electric utility service for consumers of electrical energy capacity over 20 kW (in case of construction of new object it is performed within approval of the design estimates of object under construction);

implementation construction and commissioning;

registration and approval of the Act of connection of electroinstallations of consumers to power networks (further - the Act).

At the same time during registration and approval of the Act according to the procedure, established by these Regulations, readiness of electroinstallations for operation is determined, sealing of system of accounting of electrical energy is made, the agreement of electric utility service is signed and giving of tension on electroinstallations of consumers is performed.

5. When implementing the procedure of connection of consumers to power networks:

a) Service of rendering services of connection of electroinstallations of legal entities and physical persons to power networks under the company of territorial power networks (further - PTES):

develops specifications;

develops the project of electric utility service for consumers of electrical energy capacity over 20 kW (in case of interest of the consumer);

considers the project of electric utility service for consumers of electrical energy capacity over 20 kW prepared by other project organizations;

performs construction and commissioning for consumers of electrical energy (in case of interest of the consumer);

draws up and approves the Act;

b) the project, construction and commissioning organizations perform project, construction and commissioning (in case of interest of the consumer);

c) Inspectorate for control in power industry in case of the Department of Energy of the Republic of Uzbekistan (further - Uzenergoinspektion):

approves the project of electric utility service for consumers of electrical energy capacity over 20 kW;

determines readiness of electroinstallations of consumers of electrical energy capacity over 20 kW to operation with the subsequent signing of the Act;

d) The bureau of forced execution under the Prosecutor General's Office of the Republic of Uzbekistan (further - Bureau) participates in sealing of system of accounting of electrical energy";

in Item 6 of the word "GI "Uzgosenergonadzor"" to replace with the word "Uzenergoinspektsiy";

Item in paragraph three 12, the paragraph the fourth Item 26 and Item 47 of the word "replace GI "Uzgosenergonadzor" with the word of Uzenergoinspektion;

add Item 19 with the paragraph of the following content:

"Consumers of electrical energy capacity to 20 kW have inclusive the right to sign agreements on carrying out installation and construction works with the construction organizations through EPIGU in which these organizations provide the detailed information about the rendered services and the prices of them";

state Item 20 in the following edition:

"20. Installation and construction works on connection to power network of electroinstallations by capacity to 20 kW are inclusive carried out by PTES or other construction organizations in the terms established in contracts for carrying out these works";

Document in demo-mode!

Full text is available after subscription.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.