of July 7, 2021 No. 227
About modification and amendments in some orders of the Minister of Energy of the Republic of Kazakhstan
I ORDER:
1. Approve the enclosed list of some orders of the Minister of Energy of the Republic of Kazakhstan to which changes and additions are made.
2. To provide to development department of power industry of the Department of Energy of the Republic of Kazakhstan in the procedure established by the legislation of the Republic of Kazakhstan:
1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;
2) placement of this order on official Internet resource of the Department of Energy of the Republic of Kazakhstan;
3) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Department of legal service of the Department of Energy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 1) and 2) of this Item.
3. To impose control of execution of this order on the supervising vice-Minister of Energy of the Republic of Kazakhstan.
4. This order becomes effective after ten calendar days after day of its first official publication.
Minister of Energy of the Republic of Kazakhstan
N. Nogayev
|
"Is approved" Ministry of Health of the Republic of Kazakhstan |
|
|
"Is approved" Ministry of Labour and Social Protection of the population of the Republic of Kazakhstan |
|
|
"Is approved" Ministry of the industry and infrastructure development of the Republic of Kazakhstan |
|
|
"Is approved" Ministry of Trade and integration of the Republic of Kazakhstan |
|
|
"Is approved" Ministry of Emergency Situations of the Republic of Kazakhstan |
|
|
"Is approved" Ministry of national economy of the Republic of Kazakhstan |
|
Approved by the Order of the Minister of Energy of the Republic of Kazakhstan of July 7, 2021, No. 227
1. Bring in the order of the Minister of Energy of the Republic of Kazakhstan of December 18, 2014 No. 211 "About approval of Instructions for use heat energy" (it is registered in the Register of state registration of regulatory legal acts for No. 10234) the following changes:
in the Instructions for use heat energy approved by the specified order:
to state heading of Chapter 1 in the following edition:
"Chapter 1. General provisions";
state Item 1 in the following edition:
"1. These rules of use of heat energy (further - Rules) are developed according to the subitem 22) of article 5 of the Law of the Republic of Kazakhstan "About power industry" (further - the Law) and determine procedure for use of heat energy.
The relations arising between the power making, power transferring, power supplying organizations and consumers of heat energy, are determined by the Civil code of the Republic of Kazakhstan, the Law and these rules.";
17) of Item 2 to state the subitem in the following edition:
"17) checking of measuring instruments - set of the transactions which are carried out for the purpose of confirmation of conformity of measuring instruments to mandatory metrological requirements;";
to state heading of Chapter 2 in the following edition:
"Chapter 2. Organization of heat supply";
to state heading of Chapter 3 in the following edition:
"Chapter 3. Specifications on joining of consumers of heat energy";
to state heading of Chapter 4 in the following edition:
"Chapter 4. The admission to operation of the heatconsuming installations of consumers";
to state heading of Chapter 5 in the following edition:
"Chapter 5. Installation and operation of devices of commercial accounting";
state Item 25 in the following edition:
"25. The heatconsuming installations of consumers are provided with necessary devices of commercial accounting for calculations for heat energy with the power supplying organization.
For accounting of heat energy devices of commercial accounting which types are entered in the Register of state system for ensuring the uniformity of measurements which have documents on primary or periodic checking of measuring instruments are used.
Content, maintenance and checking of devices of commercial accounting of heat energy is performed according to balance sheet accessory.
Checking of devices of commercial accounting is performed according to the Rules of carrying out checking of measuring instruments, establishments of frequency of checking of measuring instruments and form of the certificate on checking of measuring instruments approved by the order of the Minister of investments and development of the Republic of Kazakhstan of December 27, 2018 No. 934 (it is registered in the Register of state registration of regulatory legal acts for No. 18094).
Checking of devices of commercial accounting is performed by the specialized organizations accredited according to the Law of the Republic of Kazakhstan "About accreditation in the field of assessment of conformity".";
state Items 27 and 28 in the following edition:
"27. Checking of devices of commercial accounting is made according to intertesting interval on the device of the terms specified in checking techniques and also, in case of doubt in correctness of their indications, according to the statement of one of concerned parties.
28. If in case of extraordinary checking it will be found out that indications of devices of commercial accounting exceed the error allowed by their class of accuracy, costs for extraordinary checking are paid by the owner of devices. Otherwise, costs for checking are incurred by the party requiring checking.";
to state heading of Chapter 6 in the following edition:
"Chapter 6. Operation by consumers of systems of heatconsumption";
to state heading of Chapter 7 in the following edition:
"Chapter 7. Conditions of restriction and interruption in supply of heat energy to consumers";
to state heading of Chapter 8 in the following edition:
"Chapter 8. Determination of amount of heat energy in vapor released to consumers";
to state heading of Chapter 9 in the following edition:
"Chapter 9. Determination of amount of heat energy in the hot water released to consumers and determination of amount of the condensate returned by consumers";
to state heading of Chapter 10 in the following edition:
"Chapter 10. Presentation and payment of payment documents";
to state heading of Chapter 11 in the following edition:
"Chapter 11. The additional regulations on use of heat energy of consumers using heat energy for domestic needs".
2. Bring in the order of the Minister of Energy of the Republic of Kazakhstan of March 19, 2015 No. 222 "About approval of User Safety Rules for Operating Electrical Equipment" (it is registered in the Register of state registration of regulatory legal acts for No. 10889) the following changes and amendments:
in User Safety Rules for Operating Electrical Equipment approved by the specified order:
to state heading of Chapter 1 in the following edition:
"Chapter 1. General provisions";
state Item 2 in the following edition:
"2. In these rules the following basic concepts and determinations are used:
1) the worker having group II-V - degree of qualification of personnel on electrical safety;
2) the works performed according to the procedure of the current operation - repair and other work, small on amount (no more than one change), on maintenance performed in electroinstallations up to 1000 volts (further - In) operational, operational maintenance force on the fixed equipment according to the list approved by the head (chief engineer) of the organization;
3) special works - works to which increased requirements on safety are imposed;
4) the open distributing device (further - I SHOUT) - the distributing device where all or capital equipment are located in the open air;
5) administrative technicians - heads and specialists to whom obligations on the organization of technical and operational servicing, carrying out repair, installation and adjustment work in electroinstallations are assigned;
6) electricity transmission air-line (further - VL) - the device for transmission of electricity on the wires located in the open air and attached by means of insulators and fittings to support or brackets and racks on engineering constructions (bridges, overpasses, etc.). Linear portals or linear inputs of distributing devices, and for branches - otvetvitelny support and the linear portal or linear input of distributing devices are accepted to the beginning and the end of air-line of electricity transmission;
7) the conservation zone of air-lines of electricity transmission and aerial communication lines - zone along transitions of air-lines through reservoirs (the rivers, canals, lakes, etc.) in the form of the airspace over surface of the water of reservoirs limited to the vertical planes remote on both sides of the line from extreme wires in case of not their rejected provision for navigable reservoirs at distance of 100 meters (further - m), for non-navigable - at the distance provided for establishment of conservation zones along the air-lines passing by land or the zone along air-lines in the form of the parcel of land and airspace limited to the vertical planes remote on both sides of the line from extreme wires in case of not their rejected provision at distance:
for air-lines up to 1 kilovolt (further - kV) and aerial communication lines - 2 m;
for air-lines of 1-20 kV - 10 m;
for air-lines of 35 kV - 15 m;
for air-lines of 110 kV - 20 m;
for air-lines 150, 220 kV - 25 m;
8) works at height - workplaces and passes to them at height of 1,3 of m and more and distance less than 2 m from difference border on height protected with temporary barriers. In case of impossibility of the device of these barriers works at height are performed with use of safety belts;
9) crew - group of two people and more, including the operator (observing);
10) intensity of undistorted electric field - the electric field strength, the person who is not distorted by presence and the measuring device determined in zone where the person should be in process of work;
11) secondary connections (secondary chains) - set of ranks of the clips, electric wires and cables connecting devices and control units, electroautomatic equipment, blocking, measurements, protection and alarm systems;
12) the closed distributing device (further - ZRU) - the distributing device which equipment is located in the building;
13) accession - the electric chain (the equipment and tires) of one appointment, the name and tension attached to tires of RU, the generator, board, assembly and which is in limits of power plant, substation. Electric chains of different tension of one power transformer (irrespective of number of windings), one 2-speed electric motor are considered as one accession. In schemes of polygons, one-and-a-half schemes all switching devices and tires by means of which this line or the transformer are attached to the distributing device belong to accession of the line, the transformer;
14) explosion-proof electric equipment - electric equipment in which constructive measures for elimination or difficulty of possibility of ignition (are provided in case of operation) the explosive mix surrounding it;
15) operational maintenance force - the maintenance force which is specially trained and prepared for operational servicing in the approved amount of the electroinstallations assigned to it;
16) operation personnel - the personnel exercising operational management and servicing of electroinstallations (survey, operational switchings, preparation of workplace, the admission and supervision for working, performance of works according to the procedure of the current operation);
17) grounding - deliberate electric connection of any point of network of electroinstallation or the equipment with the grounding device;
18) the complete distributing device (further - CREWE) - the distributing device consisting from fully or partially the closed cases or blocks with the devices which are built in them, devices of protection and automatic equipment, delivered in the collected or completely prepared for assembly type;
19) steeplejack works - the works performed at the height more than 2 m from the Earth's surface, overlapping or working flooring over which works directly with designs or the equipment are performed in case of their installation or repair. At the same time the fixed assets protecting working from fall are the safety leash and method of its fixture;
20) maintenance force - the personnel providing maintenance and repair, installation, adjustment and testing of electric equipment;
21) preparation of workplace - accomplishment prior to works of technical actions for prevention of impact on the working dangerous production factor on workplace;
22) work category - the works specified in the corresponding column of the work permit are subdivided into works with removal of tension, without removal of tension, without removal of tension on the potential of current carrying part;
23) the admission to works primary - the admission to works on the order or the job specification performed for the first time;
24) the repeated admission to works - the admission to the works which were earlier carried out according to the work permit and also after work stoppage;
25) the hoisting machine - the technical device of cycling action for lifting and moving load;
26) the cable line (further - C) - the line for transmission of electricity or its separate impulses consisting of one or several parallel cables with connecting, lock and trailer couplings (seals) and fasteners, and for oil-filled cable lines, besides, with the feeding devices and system of the alarm system of pressure of oil;
27) the conservation zone of cable power lines and cable communication lines - the land area along underground cable lines limited to the vertical planes remote on both sides of the line from extreme cables at distance of 1 m for C and 2 m for cable communication lines, and for the cable lines up to 1000 V passing in the cities under sidewalks at distance of 0,6 of m and 1 m respectively towards carriageway and the counter party;
28) works with removal of tension - work when from current carrying parts of electroinstallation on which works will be performed shutdown of switching devices, by detachment of tires, cables, wires removes stress and are taken the measures interfering giving of tension on current carrying parts to place of employment;
29) the switching device - the electric device intended for switching of electrical energy and removal of tension from part of electroinstallation (the switch, the loading switch, separator, the disconnector, the automatic machine, knife switch, the package switch, safety lock);
30) electroinstallation with the simple evident scheme - the distributing device over 1000 V with the single partitioned or not sectioned system of tires which does not have cold system of tires, all air-lines and C, all electroinstallations up to 1000 V;
31) survey - visual inspection of electric equipment, buildings and constructions, electroinstallations;
32) sign of safety (poster) - the sign intended for the warning of the person of possible danger, prohibition or the instruction of certain actions, and also for information on arrangement of objects which use is connected with exception or decrease in effects of impact of dangerous and (or) harmful production factors;
33) the operating electroinstallation - electroinstallation or its part which is energized, or on which tension can be given turning on of switching devices;
34) the signing person - the physical person or legal entity legally owning the closed key of the digital signature and having rights to its use in the electronic document;
35) protective grounding - grounding of parts of electroinstallation for the purpose of ensuring electrical safety;
36) electric substation - the electroinstallation intended for transformation and distribution of electrical energy;
37) zone of influence of magnetic field - space in which intensity of magnetic field exceeds 80 amperes on meter (further - the Car);
38) instructing target - the instructions for safe accomplishment of specific work in electroinstallation covering category of persons determined by the job specification or the order from issued the job specification, made the order to the member of crew or the contractor;
39) mechanisms - hydraulic elevators, telescopic towers, excavators, tractors, auto-loaders, boring and crane machines, sliding ladders with the mechanical drive;
40) the mechanical lock - the lock which is locked key, the removable handle;
41) the work permit (further - the job specification) - task for the work production which is drawn up on the special form of the established form or on the electronic document and the determining content, place of employment, time of its beginning and the termination, condition of safe carrying out, structure of crew and persons responsible for safe performance of work;
42) the order - task for the work production determining it content, the place, time, security measures (if they are required) and persons to whom its accomplishment, with indication of group on electrical safety is entrusted;
43) personnel - staff of the company, organization or the part of this structure allocated on the basis of nature of the performed work;
44) the distributing device (further - RU) - the electroinstallation serving for acceptance and distribution of electrical energy, consisting of set of switching devices, combined and connecting tires, auxiliary devices of relay protection and automatic equipment and means of accounting and measurement;
45) maintenance - complex of transactions or transaction on maintenance of working capacity or operability of product in case of proper use, expectation, storage and transportation;
46) not current carrying part - part of electroinstallation which can appear energized in emergency operation of work (for example, the case of the electrical machine);
47) current carrying part - the part of electroinstallation which is normally energized;
48) work without removal of tension on current carrying parts or near them - the work performed with touch to the current carrying parts which are energized (working or induced), or at distances from these current carrying parts of less admissible;
49) air-line under the induced tension - air-lines and aerial communication lines which pass on all length or on certain sites near the operating air-lines or near contact network of the electrified railroad of alternating current on which disconnected wires in case of different schemes of their grounding (and also in the absence of grounding) and in case of the greatest working current of the operating air-lines (contact network) voltage more than 25 V is directed;
50) the consumer - the physical person or legal entity consuming electrical energy on the basis of the agreement;
Urgent works - the works performed instantly for prevention of impact on people of dangerous production factor which can lead to injury or other sudden sharp deterioration in health, and also work on elimination of the defects and damages menacing with violation of normal operation of the equipment, constructions, devices of thermal automatic equipment and management (further - CONCEAL 51)), systems electro-and heat supplies of consumers;
52) power network - set of substations, distributing devices and the electric lines connecting them placed in the territory of consumers of electrical energy;
53) electroinstallation - set of the machines, devices, lines and the service equipment (together with constructions and rooms, in which they are established) intended for production, transformation, transfer, consumption of electrical energy and (or) its transformation to other type of energy;
54) workplace in case of performance of works in electroinstallation - the site of electroinstallation where the personnel for performance of work according to the job specification, the order or according to the procedure of the current operation are allowed;
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.