RESOLUTION OF THE CABINET OF MINISTERS OF UKRAINE

of April 19, 2022 No. 470

About modification of the Approval procedure of construction projects and conducting their examination

The Cabinet of Ministers of Ukraine decides:

Bring in the Approval procedure of construction projects and conducting their examination approved by the resolution of the Cabinet of Ministers of Ukraine of May 11, 2011 No. 560 (The Official Bulletin of Ukraine, 2011, No. 41, Art. 1674; 2012, No. 50, Art. 1973; 2015, No. 72, Art. 2362; 2019, No. 17, the Art. 570), changes which are applied.

Prime Minister of Ukraine

D. Shmygal

Approved by the Resolution of the Cabinet of Ministers of Ukraine of April 19, 2022 No. 470

Changes which are made to the Approval procedure of construction projects and conducting their examination

1. The paragraph one of Item 3 to add with offers of the following content: "During action of warlike situation project development of construction on capital repairs of objects (irrespective of class of the effects (responsibility) damaged as a result of military operations it is allowed to perform as a part of the defective act in which physical amounts of works, the explanatory note in which conditions of performance of works and estimate documentation based on the report on results of the inspection developed according to the Procedure for carrying out inspection of the construction objects accepted in operation approved by the resolution of the Cabinet of Ministers of Ukraine of April 12, 2017 No. 257 (The Official Bulletin of Ukraine, are specified 2017, to No. 33, by the Art. 1045) are determined. The specified report shall contain the conclusion about technical condition of object, the sheet of the damaged (destroyed) designs, engineering systems (with indication of degree and amounts of damages, their technical condition), and also recommended measures for recovery of operational suitability of object. The decision concerning amount of the project documentation (concerning possibility of project development of construction as a part of the defective act, the explanatory note and estimate documentation) is accepted by the chief architect of the project and/or the chief project engineer in coordination with the customer, it is specified in design assignment.".

2. The fourth Item 10 after figures and the words "300 thousand hryvnias" to add the paragraph with words and figure", and during action of warlike situation - 1 million hryvnias".

 

Document in demo-mode!

Full text is available after subscription.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.