Document from CIS Legislation database © 2003-2025 SojuzPravoInform LLC

ORDER OF THE MINISTER OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN

of June 30, 2023 No. 248

About introduction of amendments to some orders of the Department of Energy of the Republic of Kazakhstan

I ORDER:

1. Approve the enclosed list of some orders to which changes, according to appendix to this order are made.

2. To provide to development department of power industry of the Department of Energy of the Republic of Kazakhstan in the procedure established by the legislation of the Republic of Kazakhstan:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) placement of this order on official Internet resource of the Department of Energy of the Republic of Kazakhstan;

3) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Department of legal service of the Department of Energy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 1) and 2) of this Item.

3. To impose control of execution of this order on the supervising vice-Minister of Energy of the Republic of Kazakhstan.

4. This order becomes effective since July 1, 2023, except for Items 3 and 6 of the enclosed list of some orders approved by this order which become effective after day of its first official publication.

Minister of Energy of the Republic of Kazakhstan

A. Satkaliyev

Appendix

to the Order of the Minister of Energy of the Republic of Kazakhstan of June 30, 2023 No. 248

Approved by the Order of the Minister of Energy of the Republic of Kazakhstan of June 30, 2023, No. 248

The list of some orders of the Minister of Energy of the Republic of Kazakhstan to which changes are made

1. In the order of the Minister of Energy of the Republic of Kazakhstan of February 2, 2015 No. 58 "About approval of Rules on prevention of emergency violations in single electric utility system of Kazakhstan and their liquidation" (it is registered in the Register of state registration of regulatory legal acts for No. 10552) the following changes and amendments:

to state preamble of the order in the following edition:

"According to the subitem 14) of article 5 of the Law of the Republic of Kazakhstan "About power industry" I ORDER:";

in Rules on prevention of emergency violations in the single electric utility system of Kazakhstan and their liquidation approved by the specified order:

to state heading of Chapter 1 in the following edition:

"Chapter 1. General provisions";

state Item 1 in the following edition:

"1. Rules on prevention of emergency violations in single electric utility system of Kazakhstan and their liquidation (further – Rules) are developed according to the subitem 14) of article 5 of the Law of the Republic of Kazakhstan "About power industry" (further – the Law) and determine procedure for prevention of emergency violations in single electric utility system of Kazakhstan and their liquidation.";

to state heading of Chapter 2 in the following edition:

"Chapter 2. Procedure for prevention and liquidation of emergency violations";

state Item 17 in the following edition:

"17. Antiemergency control on decrease in generation is exercised of the devices of automatic unloading of power plants influencing shutdown of generators at block power plants, hydroelectric power stations, power plants on the basis of renewable energy resources or unloading of turbines. Antiemergency control on emergency increase in generation is exercised of devices of automatic loading of generators.";

state Item 24 in the following edition:

"24. The system operator performs monitoring of amount of the loading connected to special automatic equipment of shutdown of loading. For ensuring monitoring all amount of the loading connected to special automatic equipment of shutdown of loading is equipped with the telemetry devices providing automatic data transmission according to the procedure, the stipulated in Item 191 order of the Minister of Energy of the Republic of Kazakhstan of December 18, 2014 to No. 210 "About approval of Power grid rules" (it is registered in the Register of state registration of regulatory legal acts for No. 10899), under the approved protocols of data transmission and lists of exchange of telemetry, on control office of the system operator.";

state Item 29 in the following edition:

"29. Unloading of hydrogenerators is performed by shutdown of the switch of the generator with the subsequent closing of the directing device.

The type and amount of automatic unloading of power plants are determined based on conditions of ensuring dynamic and static stability, exception of current overload of the equipment in case of the emergency shutdowns arising in electric utility system or its separate nodes.

Automatic unloading of power plant is carried out at block power plants, hydroelectric power stations and power plants on the basis of renewable energy resources, irrespective of type of property, working as a part of single electric utility system.

Application of automatic unloading of power plants in single electric utility system is determined by the system operator.".

2. In the order of the Minister of Energy of the Republic of Kazakhstan of February 20, 2015 No. 111 "About approval of Rules of the organization and functioning of the retail market of electrical energy, and also provision of services in this market" (it is registered in the Register of state registration of regulatory legal acts No. 10533) the following changes:

in the Rules of the organization and functioning of the retail market of electrical energy, and also provision of services in this market approved by the specified order:

state Item 2 in the following edition:

"2. In these rules the following concepts and determinations are used:

1) settlement period – the interval of time determined by the agreement of electric utility service for which calculation for the rendered services and/or delivery of electrical energy is made;

2) the actual balance – the document constituted by the power transferring organization operating power networks of the regional level, establishing address distribution of amounts of the delivered and consumed electrical energy subjects in the retail market of electrical energy for settlement period;

3) power networks of the regional level – set of substations, distributing devices and the power lines connecting them intended for transfer of electrical energy between areas in one area or between districts of different areas;

4) specifications – the technical requirements necessary for execution of connection to power networks;

5) the agreement of electric utility service – the agreement signed on the basis of the standard agreement of electric utility service according to which the power supplying organization shall give to the consumer through the attached network electrical energy and the consumer shall pay the accepted electrical energy, and also observe the mode of its consumption provided by the agreement, ensure safety of operation of the power networks which are under its authority and operability of the devices used by it and the equipment connected with consumption of electrical energy.

Document in demo-mode!

Full text is available after subscription.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.