Document from CIS Legislation database © 2003-2026 SojuzPravoInform LLC

ORDER OF THE MINISTER OF INDUSTRY AND CONSTRUCTION OF THE REPUBLIC OF KAZAKHSTAN

of February 27, 2025 No. 68

About introduction of amendments to the order of the Minister of investments and development of the Republic of Kazakhstan of May 24, 2018 No. 374 "About approval of Rules of submission of reports by subsoil users when carrying out transactions on exploration and production of solid minerals, production of popular minerals"

I ORDER:

1. Bring in the order of the Minister of investments and development of the Republic of Kazakhstan of May 24, 2018 No. 374 "About approval of Rules of submission of reports by subsoil users when carrying out transactions on exploration and production of solid minerals, production of popular minerals" (it is registered in the Register of state registration of regulatory legal acts at No. 17063) the following changes:

in Rules of submission of reports by subsoil users when carrying out transactions on exploration and production of solid minerals, production of the popular minerals approved by the specified order:

state Item 6 in the following edition:

"6. The reports provided by items 4 and 5 these rules are represented by subsoil users by means of filling of electronic form in the information system "Single Platform of Subsurface Use" (further - EPN) and signings by the digital signature of the official of the subsoil user given authority for submission of information.";

state Item 7 in the following edition:

"7. The authorized body on studying of subsoil on the basis of reports prepares summary information which sends by means of EPN to competent authority and local executive bodies of area, city of republican value, the capital within two months after the term of submission of reports on accomplishment of obligations of licensed contractual terms.";

state Item 8 in the following edition:

"8. In the absence of separate indicators in the corresponding report form crossed out sections are put down.

The additional information (cover letters, copies of the enclosed documents) is entered into EPN and are signed by the digital signature of the official of the subsoil user given authority for submission of information.";

state Item 9 in the following edition:

"9. The report provided for previous year no later than July thirtieth every year is subject to adjustment.";

1, of 2, of 3, of 4, of 5, of 6, of 7, 8 and 9 to be reworded as follows appendices according to appendices 1, of 2, of 3, of 4, of 5, of 6, of 7, 8 and 9 to this order.

2. To provide to department of subsurface use of the Industry ministry and construction of the Republic of Kazakhstan in the procedure established by the legislation:

1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;

2) placement of this order on Internet resource of the Industry ministry and construction of the Republic of Kazakhstan.

3. To impose control of execution of this order on the supervising vice-Minister of Industry and construction of the Republic of Kazakhstan.

4. This order becomes effective after ten calendar days after day of its first official publication.

Minister of Industry and constructions of the Republic of Kazakhstan

K. Sharlapayev

It is approved

Bureau of national statistics of the Agency on strategic planning and reforms of the Republic of Kazakhstan

 

Appendix 1

to the Order of the Minister of Industry and construction of the Republic of Kazakhstan of February 27, 2025 No. 68

Appendix 1

to Rules of submission of reports by subsoil users when carrying out transactions on exploration and production of solid minerals, production of popular minerals

It is represented: in competent authority on investigation of solid minerals.

The form intended for collection of administrative data on a grant basis is placed on the Internet – resource: https://www.gov.kz/memleket/entities/mps.

Name of administrative form: The performance report of licensed obligations on investigation of solid minerals.

Index of the form intended for collection of administrative data on a grant basis: 1-RTPI.

Frequency: annual.

Accounting period: year.

The group of people, representing the form intended for collection of administrative data on a grant basis: subsoil users according to licenses for investigation of solid minerals.

The term of representation of the form intended for collection of administrative data on a grant basis: annually no later than April 30 of the year following the accounting period.

IIN/BIN

Collection method: in electronic form by means of single platform of subsurface use.

Section 1. Information about the subsoil user (legal entity or physical person) and relation to the license for investigation of solid minerals

№ of payment order

General information about the subsoil user and the right of subsurface use

Value

1

2

3

1.

Full name of the subsoil user - legal person / surname, name and middle name (in case of its availability) the subsoil user physical person

1.1.

Business and identification number / individual identification number

2.

The accounting period for which the report is provided

3.

License number

3.1.

Date of issue of the license

3.2.

End date of term of the license

4.

The number of blocks for the beginning of the accounting period

5.

Number of blocks by the end of the reporting period

6.

Date of refusal of blocks in the accounting period (when applicable)

7.

The number of blocks which the subsoil user refused by the beginning of the accounting period (in the presence) since the beginning of action of the license

7.1.

including, in % of the initial number of blocks according to the license

8.

The required amount of ensuring obligation fulfillment on mitigation of consequences of transactions on investigation in the accounting period, in thousands of tenges

9.

Details for obligation fulfillment on mitigation of consequences of transactions on investigation

9.1.

Method (methods) of ensuring obligation fulfillment on mitigation of consequences of transactions on investigation

9.2.

The amount (amounts) of ensuring obligation fulfillment on mitigation of consequences of transactions on investigation, in thousands of tenges

10.

Date of provision of ensuring obligation fulfillment on mitigation of consequences of transactions on investigation to authorized body in the field of solid minerals

10.1.

The amount of ensuring obligation fulfillment on mitigation of consequences of transactions on investigation to authorized body in the field of solid minerals, in thousands of tenges

11.

Start date of carrying out mountain and overburden works for the purpose of trial production in the accounting period (when applicable)

12.

Date of issue of permission of authorized body in the field of solid minerals on withdrawal of mountain weight or movement of the soil more than 1000 CBM (when applicable)

13.

Details for collateral security of obligation fulfillment on mitigation of consequences of transactions on investigation during the accounting period in case of withdrawal more than 1000 CBM of mountain weight or movement of the soil

13.1.

Method (methods) of collateral security of obligation fulfillment on mitigation of consequences of transactions on investigation during the accounting period in case of withdrawal more than 1000 CBM of mountain weight or movement of the soil

13.2.

The amount (amounts) of collateral security of obligation fulfillment on mitigation of consequences of transactions on investigation during the accounting period in case of withdrawal more than 1000 CBM of mountain weight or movement of the soil, in thousands of tenges

14.

Date of provision of collateral security of obligation fulfillment on mitigation of consequences of transactions on investigation to authorized body in the field of solid minerals

15.

The date of receipt of the last positive conclusion of complex examination / examination of industrial safety and the state environmental assessment of the liquidation plan (the changed liquidation plan) by provision of collateral security of obligation fulfillment on mitigation of consequences of transactions on investigation to authorized body in the field of solid minerals

16.

The date of receipt of the last positive conclusion of the state environmental assessment of the plan of investigation (if it is required), including taking into account changes

17.

Approval date the subsoil user of the plan of investigation (changes in the plan of investigation) authorized body in the field of solid minerals

17.1.

Date of provision of the plan of investigation (changes in the plan of investigation) to authorized body in the field of solid minerals

18.

Surname, name and middle name (in case of its availability) the auditor/name, business and identification number of auditing organization, contact information (the address, phone, e-mail), the name and details of the audit report confirming the expenses specified in this report

Section 2. Data on expenses on investigation of solid minerals for the accounting period

№ of payment order

Name of Articles

Code of line

Units of measure

Minimum indicator

The fact since the beginning of year

1

2

3

4

5

6

1.

Annual expenses on investigation, in total

509

thousands of tenges

2.

from them: exploration works

100

thousands of tenges

3.

geochemical works

101

thousands of tenges

4.

geophysical works

102

thousands of tenges

5.

works on remote sensing

103

thousands of tenges

6.

surveying works

104

thousands of tenges

7.

core drilling

105

thousands of tenges

8.

full-hole drilling

106

thousands of tenges

9.

carrying out ditches, trenches, holes and other prospecting excavations

107

thousands of tenges

10.

supply of field groups

108

thousands of tenges

11.

design and outline works

109

thousands of tenges

12.

transportation

110

thousands of tenges

13.

works on breakdown of the field camp

111

thousands of tenges

14.

researches of state of environment

112

thousands of tenges

15.

preparation of the feasibility statement

113

thousands of tenges

16.

works on mitigation of consequences of investigation, land reclamation

114

thousands of tenges

17.

development of project documents

115

thousands of tenges

18.

researches on the choice of technology of conversion of solid minerals

116

thousands of tenges

19.

carrying out laboratory researches and analysis of tests

117

thousands of tenges

20.

preparation of reports on results of exploration works

118

thousands of tenges

21.

other works on geological exploration

119

thousands of tenges

22.

other expenses for the managerial and administrative needs, conducting financial accounting, scientific research, personnel training and other similar expenses which are directly connected with transactions on the site of investigation

120

thousands of tenges

23.

subscription bonus

531

thousands of tenges

24.

payment for use of the parcels of land (lease payment)

541

thousands of tenges

25.

Additional obligations (in the presence)

132

thousands of tenges

26.

The total amount of expenses according to the license relating to expenses on transactions on investigation taking into account provisions of Items 7, of the 8 and 9 article 192 of the Code of the Republic of Kazakhstan "About subsoil and subsurface use", suffered according to the license from date of its issue on the previous accounting period inclusive

133

thousands of tenges

Name ____________________________________________

Address ___________________________________________________

_________________________________________________ phone

E-mail address __________________________________

Contractor:

_______________________________________ ______________
      (Surname, name, middle name (in case of its availability)) (signature)

The head or person authorized on signing:

Document in demo-mode!

Full text is available after subscription.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.