of October 2, 2026 No. 1290
About modification of the Order of the Government of the Russian Federation of December 27, 2004 No. 861
The government of the Russian Federation decides:
1. Approve the enclosed changes which are made to Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also the objects of electric grid economy belonging to the network organizations and other persons, to power networks, approved by the order of the Government of the Russian Federation of December 27, 2004 No. 861 "About approval of Rules of non-discriminatory access to services in transfer of electrical energy and rendering these services, Rules of non-discriminatory access to services in supervisory control in power industry and rendering these services, Rules of non-discriminatory access to services of the commercial operator of the wholesale market and rendering these services and Rules of technological connection of power receiving devices of consumers of electrical energy, facilities for production of electrical energy, and also objects of electric grid economy, belonging to the network organizations and other persons, to power networks" (The Russian Federation Code, 2004, No. 52, Art. 5525; 2009, No. 17, Art. 2088; 2010, No. 40, Art. 5086; 2012, No. 23, Art. 3008; 2013, No. 33, Art. 4392; No. 35, Art. 4523; No. 42, Art. 5373; 2015, No. 25, Art. 3669; 2016, No. 41, Art. 5838; No. 51, Art. 7372; 2017, No. 20, Art. 2927; No. 21, Art. 3009; 2018, No. 17, Art. 2503; No. 34, Art. 5483; 2019, No. 23, Art. 2940; 2020, No. 11, Art. 1564; No. 14, Art. 2136; 2021, No. 6, Art. 984, 985; No. 11, Art. 1796; No. 18, Art. 3148; No. 42, Art. 7123; 2022, No. 1, Art. 255; No. 12, Art. 1845; No. 27, Art. 4863; 2023, No. 5, Art. 784; No. 13, Art. 2279, 2304; 2024, No. 13, Art. 1801; No. 22, Art. 2949; No. 36, Art. 5440, 5482; No. 45, Art. 6825; No. 47, Art. 7143; No. 50, Art. 7764; 2026, No. 6, Art. 581).
2. To Federal Antimonopoly Service in 4-month time to bring the regulatory legal acts into accord with this resolution.
Russian Prime Minister
M. Mishustin
Approved by the Order of the Government of the Russian Federation of October 2, 2026 No. 1290
1. In the offer the second the subitem "g" of Item 7 of the word "which are used by physical persons for the domestic and other needs which are not connected with implementation of business activity" to exclude.
2. In the paragraph the second Item 8 of the word "For the purposes of These Rules" shall be replaced with words "For the purposes of determination of the network organization which objects of electric grid economy are located at the smallest distance from borders of the site of the applicant,".
3. Item 8 paragraph two (7) after words "in the cases provided by paragraph one of this Item", to add with the words "and also technological accession of apartment houses and houses of the blocked building using the permanent scheme of electric utility service".
4. In Item 10:
a) add the subitem "a" with the offer of the following content: "Applicants whose borders of the site are subject to determination according to the paragraph the third or fourth Item 16 (1) these rules, on the plan of arrangement of power receiving devices location and the number of introduction devices with bindings to borders of the parcel of land with indication of the size of the attached maximum capacity and quantity of points of accession on each introduction device specify;";
b) to state paragraph two of the subitem "g" in the following edition:
"copies of the documents confirming possession of the applicant on the property right or on other basis provided by the law of capital construction project (the non-residential premise in such capital construction project) and (or) the parcel of land on which are located (will be located) power receiving devices of the applicant. In case of submission by the applicant which maximum capacity of power receiving devices makes no more than 150 kW inclusive of copies of the documents confirming possession of the applicant on other basis provided by the law of capital construction project (the non-residential premise in such capital construction project) and (or) the parcel of land, such copies of documents shall contain the information about person who transferred right of possession and (or) uses of such object to the applicant (for legal entities - full name, the primary state registration number and identification taxpayer number, for individual entrepreneurs - surname, name, middle name of physical person, the primary state registration number of the individual entrepreneur and identification taxpayer number, for physical persons - surname, name, middle name (in the presence), series, number and date of issue of the passport or other document, the citizen proving the identity in the territory of the Russian Federation), and if such person is not owner of capital construction project (the non-residential premise in such capital construction project) and (or) the parcel of land, - the specified information about the owner of such object. In case of representation as the document according to this paragraph of the copy of the statement from the Single state real estate register such statement shall be received not earlier than before 30 days about day of application;";
c) add with the subitem "y" of the following content:
"s) in case of application for the purpose of increase in the maximum capacity of earlier attached power receiving devices without change of category of reliability of electric utility service, points of accession, types of productive activity by the applicant which maximum capacity of power receiving devices as a result of such increase in the maximum capacity will make no more than 150 kW inclusive - the copy of the document confirming the technological connection of power receiving devices to objects of electric grid economy of the network organization or to objects of electric grid economy of the other person which is earlier performed as appropriate according to the procedure, provided by Items 40 (4) - 40(10) these rules (it is represented if technological connection of power receiving devices was performed not within the agreement signed between the applicant and the network organization to which the application for the purpose of increase in the maximum capacity of earlier attached power receiving devices is submitted).".
5. Third the subitem "v" of Item 16 after the words "in case of violation" to add the paragraph with words "the term of introduction of payment for technological accession,".
6. In Item 17:
a) word in paragraph one of "tension class necessary for the applicant" shall be replaced with words "class of tension 0,4 of kV and below";
b) to add the paragraph of the eighth after words of "the existing objects of electric grid economy of the network organizations" with words "class of tension 0,4 of kV and below";
c) in the paragraph the twentieth:
after the words "referred to the third category of reliability (on one source of electric utility service)" to add with the words "which are used for the domestic and other needs which are not connected with implementation of business activity";
shall be replaced with words words of "tension class necessary for the applicant" "class of tension 0,4 of kV and below";
d) in the paragraph the twenty sixth shall be replaced with words words of "tension class necessary for the applicant" "class of tension 0,4 of kV and below";
e) the thirtieth to add the paragraph with the words "or without specifying of term";
e) to add the paragraph of the thirty second with words "(except for the technological connection of power receiving devices performed according to requests of persons, the specified in paragraphs eleven - the nineteenth this Item which in accordance with the legislation of the Russian Federation provides the parcel of land which is in the state-owned or municipal property)";
g) thirty third after the words "on the initial parcel of land" to add the paragraph with words ", except for the technological connection of power receiving devices performed according to requests of persons, the specified in paragraphs eleven - the nineteenth this Item which in accordance with the legislation of the Russian Federation provides the parcel of land which is in the state-owned or municipal property";
h) in the paragraph the thirty fourth shall be replaced with words the words "to the closest object of power network of class of tension necessary for the applicant constituting no more than 300 meters in the cities and settlements of city type and no more than 500 meters in the rural zone it is applied proceeding from measurement of distance in a straight line from border of the territory of gardening or truck farming to the closest object of power network of the network organization having tension class specified in the request" "to the closest object of electric grid economy class of tension 0,4 of kV and below, the city type constituting no more than 300 meters in the cities and settlements and no more than 500 meters in the rural zone, are applied proceeding from measurement of distance in a straight line from border of the territory of gardening or truck farming to the closest object of electric grid economy of the network organization by class of tension 0,4 of kV and below".
7. Item 17 in paragraph nine (1) the words "entries into force" shall be replaced with words "receipts in the network organization".
8. In Item 17 (4):
a) to state paragraphs of the first and second in the following edition:
"17(4). In case of application for the purpose of increase in the maximum capacity of earlier attached power receiving devices without change of category of reliability of electric utility service, points of accession, types of productive activity by the applicant which maximum capacity of power receiving devices as a result of such increase in the maximum capacity will make no more than 150 kW inclusive in case of need of performance of works on construction (reconstruction) of the objects of electric grid economy included (which are subject to inclusion) in investing programs of the network organizations (including the adjacent network organizations), and (or) facilities for production of electrical energy, except for the actions connected with ensuring commercial accounting of electrical energy (capacity), the payment is calculated according to the procedure, provided by the paragraph third Item 17 of these rules.
If increase in the maximum capacity of earlier attached power receiving devices without change of category of reliability of electric utility service, points of accession, types of productive activity by the applicant which maximum capacity of power receiving devices as a result of such increase in the maximum capacity will make no more than 150 kW inclusive from the network organization does not require performance of works on construction (reconstruction) of the objects of electric grid economy included (which are subject to inclusion) in investing programs of the network organizations (including the adjacent network organizations), and (or) facilities for production of electrical energy, except for the actions connected with ensuring commercial accounting of electrical energy (capacity) in structure of payment inclusion is allowed:";
b) word in paragraph four" (in cases if according to these rules check of accomplishment of specifications by the applicant "or issue of the notification on providing with the network organization possibility of accession to power networks is provided)" shall be replaced with words".
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.