RESOLUTION OF THE CABINET OF MINISTERS OF THE REPUBLIC OF UZBEKISTAN

of February 21, 2014 No. 36

About the program of contract construction works for 2014

 For the purpose of ensuring timely and high-quality accomplishment of parameters of the Investing program of the Republic of Uzbekistan for 2014, further increase in efficiency of use of capital investments in the conditions of building-up of amounts of construction works, strengthening of responsibility of public authorities on places for ensuring input of objects in operation in the terms established by agreements, rational capacity utilization of contract organizations for the advancing development of modern network of transport, engineering and communication and social infrastructure the Cabinet of Ministers decides:

1. Approve the key parameters of the Program of contract construction works developed by the Ministry of Economics together with the Ministry of Finance, the State committee of the Republic of Uzbekistan on architecture and construction, Council of Ministers of the Republic of Karakalpakstan, khokimiyats of areas and Tashkent, and also other interested ministries and departments for 2014 (further - the Program) according to appendix No. 1.

2. Approve address programs of contract construction works for 2014 on construction, upgrade, reconstruction and capital repairs:

the objects of the social sphere, utility, meliorative and irrigational and road and transport infrastructure, and also large production and non-productive facilities passing for 2014 according to appendices No. No. 2 - 2.7;

the objects of the social sphere, individual housing which are again begun in 2014 in the rural zone according to standard projects on a turnkey basis, utility, meliorative and irrigational and road and transport infrastructure, and also large production and non-productive facilities according to appendices No. No. 3 - 3.8.

Assign to the Chairman of the board of Ministers of the Republic of Karakalpakstan, hokim of areas and Tashkent, heads of the ministries and departments, IK "Kishlok Kurilish Investment" the personal responsibility for ensuring timely accomplishment of programs of contract works for 2014 on construction, upgrade, reconstruction and capital repairs of the objects included in appendices No. No. 2 - 2.7, 3 - 3.8.

3. To the ministries, departments, Council of Ministers of the Republic of Karakalpakstan, khokimiyats of areas and Tashkent - customers of construction to provide:

continuity of cycle of installation and construction works on the objects passing since 2013 according to the approved production schedules of works;

timely input of objects and capacities with execution of conditions of the signed agreements in case of strict observance of quality requirements of the performed works;

monthly submission to the Ministry of Economics and the State committee of the Republic of Uzbekistan on architecture and construction of information on the program implementation course to the 5th following month under report.

4. To provide to the state committee of the Republic of Uzbekistan on architecture and construction architectural and construction supervision of observance of town-planning regulations and rules when implementing installation and construction works and system monitoring of execution by customers, project and contract organizations of conditions of the signed agreements, with monthly submission of information on results of monitoring to the Cabinet of Ministers of the Republic of Uzbekistan.

5. Taking into account results of carrying out the competitive biddings and approval of address lists of buildings to represent to the Ministry of Economics together with the State committee of the Republic of Uzbekistan on architecture and construction as required to the Cabinet of Ministers of the Republic of Uzbekistan reasonable offers on introduction, within the approved parameters, adjustments in separate indicators of the Program.

6. To impose control of execution of this resolution on the deputy prime minister of the Republic of Uzbekistan B. I. Zakirov.

Prime Minister of the Republic of Uzbekistan

Sh. Mirziyoyev

 

Appendix №1

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of February 21, 2014 No. 36

Key parameters of the Program of contract construction works for 2014




Name of sources of financing

Amounts:

KV

CMP


In total

33 012,7

17 812,5


including on large production and non-productive facilities

14 446,0

3 912,7


from total amount on work types:



I.

Construction, reconstruction and capital repairs, all

33 012,7

15 599,0


including:



1.

Centralized investments:

8 556,2

4 448,7

1.1.

Budgetary funds

1 500,0

1 315,7

1.2.

Fund of development of children's sport

230,2

209,7

1.3.

Fund of reconstruction, capital repairs and equipment of comprehensive schools, professional colleges, academic lyceums and medical institutions

729,5

537,5

1.4.

Fund of development of material and technical resources of higher educational institutions

173,4

136,2

1.5.

Fund of meliorative improvement of the irrigated lands

156,6

110,1

1.6.

Republican road fund

976,2

622,9

1.7.

Fund of reconstruction and development (equivalent in sumach) *

1 982,0


1.8.

Foreign investments and secured loans of the Government (equivalent in sumach)

2 808,4

1 516,5

2.

Not centralized investments:

24 456,4

11 150,3

2.1.

Means of the companies, including the taxes left at the disposal of the company

8 556,5

2 738,1

2.2.

Credits of commercial banks and other borrowed funds

4 006,6

1 482,4

2.3.

Direct foreign investments and credits
(equivalent in sumach)

6 173,0

1 790,2

2.4.

Means of the population

5 720,3

5 139,6

II.

Capital and running repair, and also implementation of other industry and territorial programs



* By fund of reconstruction and development of the Republic of Uzbekistan only acquisition of the equipment is provided.

Appendix № 2

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of February 21, 2014 No. 36

The main directions of the Program of contract works for construction, reconstruction and capital repairs of the objects passing for 2014

one million bags.



Name of the directions

2014.

including:

quantity of objects, units

including.
CMP

construction and reconstruction

capital repairs

quantity of objects, units

including.
CMP

quantity of objects, units

including.
CMP


In total

340

3 456 206,5

336

3 436 235,2

4

19 971,3


including:







1.

Construction and reconstruction of objects for счнт means of the Government budget

78

775 647,1

78

775 647,1



2.

Construction and reconstruction of objects by fund of development of children's sport

6

16 241,0

6

16 241,0



3.

Construction, reconstruction and capital repair of objects by fund of reconstruction, capital repairs and equipment of comprehensive schools, professional colleges, the academic lyceums and medical institutions

28

98 366,0

27

94 672,8

1

3 693,3

4.

Construction, reconstruction and capital repair of objects by fund of development of material and technical resources of higher educational institutions

6

44 211,2

3

27 933,2

3

16 278,0

5.

Construction and reconstruction of objects by fund of meliorative improvement of the irrigated lands

38

36 722,8

38

36 722,8



6.

Construction and reconstruction of objects at the expense of means of Republican road fund

47

594 804,0

47

594 804,0



7.

Construction, reconstruction and upgrade of large production and non-productive facilities

137

1 890 214,4

137

1 890 214,4



Appendix No. 2.1

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of February 21, 2014 No. 36

The program of contract works for construction and reconstruction of the objects passing for 2014 at the expense of means of the Government budget

one million bags.







Direction of use of means

Measurement unit.

Capacity

Объемы*:

Input term

Name of contract

construction organization

KV

including SMR


In total



852 416,6

775 647,1




including:







I.

Complex concerning agricultural and water economy, conversion of agricultural products and consumer goods, all



430 423,5

409 246,1




including:







1.1.

Ministry of agricultural and water economy








Measures for development of irrigational systems, increase in safety of work and reliability of operation of large and especially important water management objects,



421 113,8

406 358,1




including:







a)

on development of irrigational systems, increase in safety of work and reliability of operation of large water management objects, including:



96 113,8

91 358,1




Republic of Karakalpakstan



9 150,6

8 729,4




Reconstruction of the channel of Kegeyli from the personal computer 362 on the personal computer 554 in Chimbaysky district

km

5

435,8

435,8

 2014.

Bunyodkor meros LLC


Reconstruction of Shumangai channel with PK0 on PK560 in Shumanaysky district

km

5,6

1 000,0

950,0

 2015.

Bunyodkor meros LLC


Reconstruction of the channel Cook-Uzyak from the personal computer 0 on the personal computer 389 in Kegeyliysky district



449,2

449,2

2014.

Nukus drenazh rekonstruktion LLC


Reconstruction of Abat-yarmysh channel in Kegeyliysky district 
(1 queue)

km

6

1 265,6

1 244,4

2014.

SUE Ellikkaladav suvmakhsuspudrat


Reconstruction of the channel Mai-zhap in Chimbaysky district
(1 queue)

km

1,2

2 000,0

1 900,0

2015.

SUE Kegeylidavsuvmakhsuspudrat


Reconstruction of the channel Kyzketken in Nukus



4 000,0

3 750,0

2015.

SUE Kegeylidavsuvmakhsuspudrat


Andijan region



4 807,3

4 575,0




Reconstruction of Naray-Bura channel in Asakinsky district

km

8,0

2 810,5

2 678,3

2014.

Pakhtaobod KMS LLC


Reconstruction (recovery) of withdrawal No. No. 8 and 9 and two dyuker on the personal computer 56+00 on the mashkanal Ilgor in Dzhalalkuduksky and Andijan districts

km

4,2

1 370,7

1 341,8

2014.

SUE Andizhondavsuvmakhsuspudrat


Reconstruction of pumping point of Shirmonbulok in Bulakbashinsky district

m3/sec.

1

626,1

554,9

2014.

Gidrospetsmontazh LLC


Bukhara region



9 908,9

9 516,7




Reconstruction and construction of irrigating network in Karaulbazarsky district

km

10,9

2 000,0

1 920,0

2015.

SMU-3 OF JSC ABKS


Reconstruction of Katta Zhilvan channel in Shafirkansky district (1 queue)

km

2

1 500,0

1 470,0

2014.

SUE Shofirkondavsuvmakhsuspudrat


Reconstruction of the Goat water-engineering system of Polyakov in Vabkentsky district

piece.

1

2 408,9

2 246,7

2015.

SUE Romitongdavsuvmakhsuspudrat


Increase in reliability of operability of pressure pipeline of the Shafirkansky branch of pumping point of Kiziltepo of the ABMK system

km

1

4 000,0

3 880,0

2015.

Bukhorosuvkurilish LLC


Jizzakh region



10 329,0

9 930,9




Construction of selevodokhranilishch of Bogimazarsay in Bakhmalsky district



2 000,0

1 970,0

2015.

SUE Zhizzakhshakhardavsuvmakhsuspudrat


System reconstruction of irrigational networks in the Jizzakh region

km

9,15

1 469,4

1 412,7

2014.

SUE Uchtepadavsuvmakhsuspudrat


Water supply on lands Havast - Gallakor bypassing the territory of Tajikistan in Yangiabadsky district

m3/sec.
km

1
5,1

6 000,0

5 700,0

2016.

Zhizzakh tumanlararo suv tarmok tajmir LLC


System reconstruction of irrigational networks in Bakhmalsky and Gallyaaralsky districts

km

5,548

859,6

848,2

2014.

Zhizzakh temir beton buyumlari zavodi LLC


Kashkadarya region



9 051,9

8 406,4




Construction of selevodokhranilishch of Guldar in Yakkabagsky district of the Kashkadarya region



3 000,0

2 788,3

2015.

SUE Yakkabogdavsuvmakhpudrat


System reconstruction of irrigational networks in the Kashkadarya region (Mirishkorsky district)

km Caen.
km lot

15,2
2,8

1 030,6

963,3

2014.

Davr-Temir-Beton LLC


Reconstruction of pumping point Kungir in Kamashinsky district


0,42

1 016,4

867,8

2014.

УНЭСиС in case of Kashkadaryo of BUIS


System reconstruction of irrigational networks in the Kashkadarya region (Kasansky district)

km Caen.
km lot
m3/sec.

2,7
3,2
5,9

912,2

863,4

2014.

SUE Kosondavsuvmakhsuspudrat


Reconstruction of pumping point Yuldash for improvement of providing with irrigation water of Qarshi



298,5

279,4

2014.

37-SPMK LLC


Reconstruction of pumping point of Katta-Zhayilm in Kamashinsky district

m3/sec.

1,8

994,1

994,1

2014.

SKSRP of "Yakkabog Tongi"


Reconstruction of pumping point Pakhtakor in Shakhrisabzsky district



1 800,0

1 650,0

2015.

Hisorakgidrokurilish LLC


Navoiy region



5 873,1

5 533,2




Construction of the Kuksaraysky water storage basin in Hatyrchinsky district



3 000,0

2 860,0

2015.

GP "Uzmakhsussuvkurilish"


Construction of diversion channel of "Kuksaray" for water supply on the left and right river banks Koksaray in Hatyrchinsky district

km

8

873,1

813,2

2014.

SUE Karmanadavsuvmakhsuspudrat


Improvement of operation of the Navbakhorsky water-engineering system on the river Zarafshan in the Navoiy region



2 000,0

1 860,0

2015.

Shark kurilish service LLC


Namangan region



6 641,9

6 295,2




Reconstruction of the canal Hadikent in Yangikurgansky district

km

6,947

2 641,9

2 625,2

2014.

SUE Norindavsuvmakhsuspudrat


Reconstruction of the channel of Galab in Chustsky district

km

7,4

2 000,0

1 870,0

2015.

Mingbulaksuvtajmirkurilish LLC


Reconstruction of Namangan Branch channel and its branches in the Namangan region

km

12,8

2 000,0

1 800,0

2016.

SUE Namangandavsuvmakhsuspudrat


Samarkand region



3 204,3

3 149,2




Construction of the Kamangaransaysky water storage basin in Urgutsky district

one million m3

1,5

3 000,0

2 947,9

2015.

GP "Uzmakhsussuvkurilish"


Construction of the channel for irrigation of the existing lands with liquidation of pumping points in economy of Ipak-Eula in Pastdargomsky district

km

2,0

204,3

201,3

2014.

SUE Bulungurdavsuvmakhsuspudrat


Surkhandarya region



7 250,6

6 935,6




Construction of selevodokhranilishch of Hangaransay in Baysunsky district (1 queue)



3 500,0

3 400,0

2015.

Alpomish-20 LLC


Reconstruction of the channel of Kokayda in Dzharkurgansky district

km

0,6

101,9

99,9

2014.

State of emergency Turonirsuvkurilish


Reconstruction of pumping point Cora-aryk in Shurchinsky district

m3/sec.
km

0,79
1,2

194,6

182,3

2014.

SUE Surkhonnasostajmir


Reconstruction and construction of channels with water intake from Babatag channel for transfer of lands with machine on self-flowing irrigation in Kumkurgansky district

km

17,0

2 213,0

2 099,2

2014.

State of emergency Turonirsuvkurilish


Reconstruction of irrigational network in the Surkhandarya region

km

16,8

1 241,1

1 154,3

2014.

SUE Kizirikdavsuvmakhsuspudrat


Syr Darya region



7 254,3

6 773,0




Reconstruction of irrigating systems on the irrigated lands of Sardobinsky district

km

1

1 000,0

932,0

2015.

Deel Tur Trans LLC


Reconstruction of M-3 channel of Havastsky district

km

1,5

1 500,0

1 300,0

2015.

SUE Bayavutsuvmakhsuspudrat


Reconstruction of Shuruzyak channel in Saykhunabadsky district

km

1,5

2 000,0

1 870,0

2015.

MKK-8 LLC


Reconstruction of K-3-6 channel in Mirzaabadsky district

km

1,8

369,0

368,5

2014.

State of emergency Mirobkurilishservice


Reconstruction of PR-4 channel in Bayautsky district

km

6,58

2 385,2

2 302,5

2014.

Elitgidro stroy service LLC


Tashkent region



7 250,5

6 892,6




Reconstruction of system of channels "Left Branch" of Tashkanal for increase in water security of lands of Bekabadsky district

km

0,331

2 500,0

2 400,0

2015.

SUE Yukorichirchikdavmakhsuspudrat


Concrete facing of especially dangerous sites of the Parkentsky main canal in the Tashkent region

km

2

2 500,0

2 400,0

2015.

SUE Bukadavsuvmakhsuspudrat


Shore protection works of Burdzhar channel in Tashkent from the personal computer 47+00 on PK52+10

km

0,1

172,9

172,9

2014.

Parkentsuvkurilish LLC


Reconstruction of the channel of Morgunenkov with protection of aqueduct in Akkurgansky district



851,1

758,2

2014.

SUE Bukadavsuvmakhsuspudrat


Reconstruction of the channel Handam in Yukarichirchiksky district (1 queue)

km

1,1

704,2

693,6

2014.

SUE Yukorichirchikdavmakhsuspudrat


Reconstruction of the Left branch of the channel Tuyabuguz in Pskentsky district (1 queue)



522,3

468,0

2014.

SUE Yangiyuldavmakhsuspudrat


Fergana region



9 191,5

8 991,5




Actions for the omission of river. Dried through dike of the Sokhsky water storage basin



1 700,0

1 685,0

2015.

Sokhgidrostroy LLC


Reconstruction of Margilansay channel in Fergana

km

1

2 974,5

2 959,5

2015.

SUE Fargonadavsuvmakhsuspudrat


Shore protection works of river. Dried in Sokhsky district (the site Toole-Devayron)

km

1,9

1 517,0

1 387,0

2014.

SUE Dangaradavsuvmakhsuspudrat


Construction of pedestrian and inspection it is expensive along Margilansay channel in Fergana



3 000,0

2 960,0

2015.

DP "Yozyovonmakhsusuvkurilish"


Khorezm region



5 027,6

4 547,3




Reconstruction of shore protection constructions of the Amu Darya River on the Kizilkumsky array of the Khorezm region (1 queue)

km

4,4

1 164,3

1 130,7

2014.

Tashsaka of ITB


Reconstruction of segment lock of overflow dam of the Tuyamuyunsky water-engineering system

piece.

3

2 000,0

1 750,0

2015.

DP OF "QUYUV-MEXANIKA ZAVODI"


Reconstruction of shore protection constructions of the Amu Darya River on the Kyzyl Kum array (the 2nd queue)

km

0,5

1 500,0

1 350,0

2016.

Tashsaka of ITB


The barrier device on Kirgiz-yab channel from PK16+00 to PK42+50 in Urgench



363,3

316,6

2014.

Makhsussuvkurilish LLC

b)

reconstruction of the building of the case "B" of the Tashkent institute of irrigation and melioration

piece.

1

1 172,2

1 082,1

2014.

BSF of Sanga-Safed

c)

construction of especially important large water management objects



325 000,0

315 000,0

2017.

DSGS Uztemiryulkurilishmontazh Unitary Enterprise, 
Yuggazspetsmontazh Unitary Enterprise

1.2.

BVO "Amu Darya"



4 620,0

2 888,0




Reconstruction of hydraulic engineering constructions



4 620,0

2 888,0




including:








Reconstruction of the hydraulic engineering construction of the Takhiatashsky water-engineering system

m3/sec.

11000

2 620,0

1 048,0

2014.

Takhiatash RMZ LLC


Recovery of settler on the channel Shavat in the Khorezm region

object

1

2 000,0

1 840,0

2014.

Amu Darya LLC

1.3.

Repayment of accounts payable on the Ministry of Agriculture and Water Resources, BVO "Syr Darya" and Uzgidromet



4 689,7




II.

Complex concerning the utility sphere, transport, capital construction and building industry, all



180 742,9

163 400,0




including:







2.1.

Uzkommunkhizmat agency



23 742,9

20 900,0




Construction and reconstruction of objects



23 742,9

20 900,0




including:








Construction of the second string of conduit from pumping point of "Kaparass" to the switching camera

km

7,2

7 000,0

6 650,0

2014.

Yuggazstroy LLC


Construction of conduit of technical water for the Ustyurt GCC



15 000,0

14 250,0

2015.

Obi Hayot-engineering LLC


Repayment of accounts payable



742,9

x




Design and exploration work of next years



1 000,0

x



2.2.

GAZhK "Uzbekiston Temir Yullar"



150 000,0

142 500,0




Joint financing of construction of elektrofitsirovanny rail line Angren - Fathers

km

122,7

150 000,0

142 500,0

2016.

EP-1, UPH, divisions of GAZhK "Uzbekiston Temir Yullar"

2.3.

Gosarkhitektstroy



7 000,0

x




Program implementation of measures for step-by-step project development of the architectural and planning organization of the territories with master plans of rural settlements and the territories of descent of rural citizens for 2009 - 2014.

project


7 000,0

x



IV.

Complex concerning culture, education, health care and social protection, all



3 896,0

x




including:







4.1.

Repayment of accounts payable across Minvuz, Academies of Sciences, Minkulture and RSDYuSShOR on rhythmic gymnastics



3 896,0

x



V.

Complex concerning development of mechanical engineering, the electrotechnical and aviation industry, standardization of products, all



1 000,0

670,0




including:








Reconstruction of objects of "Uzkomgosrezerv"



1 000,0

670,0




including:








Reconstruction of Ozodlik plant

object

1

1 000,0

670,0

2014.

PMK-149 of JSC Samarkand-himstroy

VIII.

Council of Ministers of the Republic of Karakalpakstan, khokimiyats of areas and Tashkent, all



236 354,2

202 331,0




Objects of the social sphere and infrastructure



236 354,2

202 331,0




including:








Construction and reconstruction of medico-social organizations in regions of the republic



7 500,0

6 525,0




Construction and reconstruction of lyceums nursing homes of fine and applied art in regions of the republic



2 300,0

2 001,0




Objects of SIZ "Jizzakh", SIZ "Angren" and SIEZ "Navoiy"



3 000,0

2 700,0




Construction and reconstruction of objects in the cities of Andijan, Bukhara, Jizzakh, Qarshi, Nukus, Samarkand, Fergana, Urgench and Tashkent



216 810,0

187 910,7




Shore protection and other protective measures in regions of the republic



3 362,4

3 194,3




Repayment of accounts payable on the Republic of Karakalpakstan, the Andijan, Bukhara, Navoiy, Namangan, Samarkand, Syr Darya, Tashkent, Fergana regions and Tashkent.



3 381,8

x



8.1.

Council of Ministers of the Republic of Karakalpakstan



28 300,0

24 621,0




including:








Construction of lyceum nursing home of the fine arts in Nukus

уч.мест

330

2 300,0

2 001,0

2014.

Takhiatash US LLC

places general.

100


Construction of the State museum of arts in Nukus (the 2nd queue)

object

1

26 000,0

22 620,0

2016.

Uy zhay kurylys LLC

8.2.

Khokimiyat of the Jizzakh region



14 371,6

13 003,0




including:








Construction and reconstruction of infrastructure facilities and office building of SIZ "Jizzakh"

object

1

3 000,0

2 700,0

2014.

ZUS NGMK


Construction of sports complex with the football and track and field athletics sports arena on 10,0 of one thousand audience in Jizzakh

object

1

10 000,0

9 000,0

2014.

"20 Trust" of MChZh No. 17 dream вакиллик


Shore protection and other protective measures

object

6

1 371,6

1 303,0

2014.

Humoyunmirzozafar LLC, Ombiotek pharm service LLC, Lotos invest LLC, MT Kuchlanish, BSF "Karvon-Sugdiona", Drenazh zovur suv tajmir LLC

8.3.

Khokimiyat of the Namangan region



5 000,0

4 250,0




including, reconstruction of stadium in Namangan



5 000,0

4 250,0


JSC Trust-12

8.4.

Khokimiyat of the Samarkand region



11 490,8

9 966,3




including:








Construction of the House of acceptances in Samarkand

object

1

9 500,0

8 075,0


SO UDAP


Shore protection and other protective measures

object

6

1 990,8

1 891,3

2014.

SUE Okdaryodavsuvmakhsuspudrat, SUE Bulungurdav-suvmakhsuspudrat, SUE Samarkanddavsuvmakhsuspudrat, state of emergency "Gayturis Hamkor", Kent LLC, Gidro Capital Meliokurilish LLC

8.5.

Khokimiyat of the Tashkent region



7 500,0

6 525,0




including:








Construction of the new building of the sleeping case on 180 beds in the territory of sanatorium for veterans of war and the work "Tavaksay" in Bostanlyksky district

beds

180

4 000,0

3 480,0

2014.

MPChF "Mashkhur"


Reconstruction of the men's house Muruvvat for disabled people in Akhangaransky district

object

1

3 500,0

3 045,0

2014.

Okhongaron Shokhrukh Fayz LLC,
RSU-3

8.6.

Khokimiyat of the Fergana region



34 100,0

29 667,0




including:








Construction and reconstruction of objects 
in Fergana

object

93

34 100,0

29 667,0

2014.

Fayz Binokor Oltiarik LLC,
Kuvasoytajmirkurilish LLC

8.7.

Khokimiyat of the Khorezm region



51 260,0

44 596,2




including:








Construction of orphanage Muruvvat in Khiva

object

1

5 000,0

4 350,0

2014.

Irdimzon kurilish LLC


Construction and reconstruction of objects 
in Urgench



46 260,0

40 246,2

2017.

JSC Trust-12, 
Joint stock company" 93-makhsus trust"

8.8.

Khokimiyat of Tashkent



80 950,0

69 702,5




including:








Reconstruction of complex of buildings of Academy of public administration in case of the President of the Republic of Uzbekistan

object

1

40 000,0

34 400,0

2014.

JSC Trust-12


Joint financing of construction of hotel complex on st. of Navoiy

object

1

40 000,0

34 400,0

2014.

JSC Trust-12


Transfer of bed of the river Chauli bypassing the office building of MVESIT under construction

object

1

950,0

902,5

2014.

SO UDAP

* Parameters will be specified by results of recalculation of residual amounts.

Appendix No. 2.2

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of February 21, 2014 No. 36

The program of contract works for construction and reconstruction of the objects passing for 2014 by fund of development of children's sport

Name and location of object

Capacity

Объем*:

Input term

Name of contract

construction organization

KV

in that

number

CMP


In total


16 475,0

16 241,0




including:







Construction (5 objects)


14 215,0

14 031,0




Reconstruction (1 object)


2 260,0

2 210,0




Jizzakh region


4 350,0

4 245,0



1.

Construction of the covered swimming pool to universal sport center in Jizzakh

25 x 11

925,0

900,0

2014.

Ltd company "17th representation

20 trusts"

2.

Construction of universal sports complex in Jizzakh

object

3 425,0

3 345,0

2014.

Ltd company "17th representation

20 trusts"


Kashkadarya region


3 365,0

3 356,0



3.

Construction of the hall of rhythmic gymnastics under regional sports school in Qarshi

Indus.

3 365,0

3 356,0

2014.

BSF of Pakhlavon


Tashkent region


2 260,0

2 210,0



4.

Reconstruction of sports school No. 1 in Yukarichirchiksky district

object

2 260,0

2 210,0

2014.

Okhangaron binokor LLC


Khorezm region


6 500,0

6 430,0



5.

Construction of the closed swimming pool on Ulitsa "Yoshlik" in Urgench

25 x 11

2 500,0

2 480,0

2014.

JSC Yuggazstroy

6.

Construction of universal gyms on Ulitsa Yoshlik in Urgench

object

4 000,0

3 950,0

2014.

JSC Yuggazstroy

* Parameters will be specified by results of recalculation of residual amounts.

Appendix No. 2.3

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of February 21, 2014 No. 36

The program of contract works for construction and reconstruction of the objects passing for 2014 by fund of reconstruction, capital repairs and equipment of comprehensive schools, professional colleges, the academic lyceums and medical institutions

one million bags.







Name of objects

Measurement unit.

Capacity

Объемы*:

Input term

Name of the contract construction organization

KV

including SMR


In total (28 objects)

x

x

106 650,4

98 366,0




including:








Construction and reconstruction (27 objects)

x

x

102 700,4

94 672,8




Capital repairs (1 object)

x

x

3 950,0

3 693,3



I. Educational institutions


IN TOTAL



16 510,4

15 437,2




including:







1.1.

Construction



5 500,0

5 142,5




professional colleges (1 object)

уч. places

360

5 500,0

5 142,5



1.2.

Reconstruction



7 060,4

6 601,5




comprehensive schools (3 objects)

уч. places

2 211

7 060,4

6 601,5



1.3.

Capital repairs



3 950,0

3 693,3




professional college (1 object)

уч. places

1 195

3 950,0

3 693,3




Andijan region



2 853,0

2 667,6



1.

Reconstruction of comprehensive school No. 2 in Izbaskansky district (with extension of the gym 18 x 30 m)

уч. places

1 176

2 853,0

2 667,6

2014.

Lochin of KTIChF


Bukhara region



3 950,0

3 693,3



2.

Capital repairs of professional college of agricultural industry in the Bukhara district



3 950,0

3 693,3

2014.

HKMK-47 LLC


Namangan region



2 850,0

2 664,8



3.

Reconstruction of specialized boarding school No. 47 in the Naryn district (with hostel extension on 250 places and the dining room on 150 places)

уч. places

200

2 850,0

2 664,8

2014.

Ltd company" Chelsea курилиш design"


Fergana region



1 357,4

1 269,2



4.

Reconstruction of comprehensive school No. 1 in of Kuvasaye (with extension of the educational block on 315 уч. places)

уч. places

835

1 357,4

1 269,2

2014.

STATE OF EMERGENCY OF "KHMK-77"


Khorezm region



5 500,0

5 142,5



5.

Construction of professional college of tourism in Urgench

уч. places

360

5 500,0

5 142,5

2014.

Horazm temir yullari LLC

II. Medical institutions


IN TOTAL

beds

1851

90 140,0

82 928,8



the settlement in change

1200



object

6




Construction (1 object)

beds

200

8500

7820




Reconstruction (22 objects)

beds

1651

81 640,0

75 108,8



the settlement in change

1200



object

6




Medical institutions of republican value

object

3

22 270,0

20 488,4




including:








Ministry of Health

object

3

22 270,0

20 488,4




including:







1.

Reconstruction of Republican children's bone and tubercular sanatorium

object

1

14 470,0

13 312,4


LKTKZhMU Binokor

2.

Reconstruction of Republican oncological scientific center in Tashkent

object

1

3 000,0

2 760,0

2014.

JSC Parkent IKMK

3.

Reconstruction of the 9-storey case with the adjacent territory on Ulitsa Tarakkiyot, 2 in Tashkent

object

1

4 800,0

4 416,0

2014.

SPP "Hamkor comfort"


Medical institutions of regional value

beds

1851

67 870,0

62 440,4



the settlement in change

1200



object

2




Andijan region

beds

605

24 890,0

22 898,8



the settlement in change

500



object

1




from them:







4.

Reconstruction of the regional multi-profile medical center in Andijan

object

1

1 600,0

1 472,0

2014.

DP "Imkon Kurilish Savdo"

5.

Reconstruction of the regional children's multi-profile medical center in Andijan

beds

50

1 350,0

1 242,0

2014.

Baraka fayz ikhtisoslashgan kurilish LLC

6.

Reconstruction of regional oncological dispensary in Andijan

beds

130

2 700,0

2 484,0

2014.

Dozstroyservice LLC

the settlement in change

100

7.

Reconstruction of Altynkulsky RMO

object

1

4 990,0

4 590,8

2014.

Hon of MHIChK

beds

145

8.

Reconstruction of Balykchinsky RMO

beds

85

3 700,0

3 404,0

2014.

Ikhtisoslashgan Shakhrikhon kurilish LLC

9.

Reconstruction of Izbaskansky RMO

beds

40

4 200,0

3 864,0

2014.

Shox Yun Ali LLC

the settlement in change

300

10.

Reconstruction of Asakinsky RMO

the settlement in change

100

2 700,0

2 484,0

2014.

Andizhon tezkor kurilish LLC

11.

Reconstruction of maternity complex No. 1 Andijan

beds

155

3 650,0

3 358,0

2014.

ChMSRP "Andizhon Buston"


Kashkadarya region

beds

30

1 800,0

1 656,0



the settlement in change

100




from them:







12.

Reconstruction of regional oncological dispensary in Qarshi

beds

30

1 800,0

1 656,0

2014.

Guzor-F LLC

the settlement in change

100


Navoiy region

beds

155

7 730,0

7 111,6



the settlement in change

350




from them:







13.

Reconstruction of regional oncological dispensary in Navoiy

beds

60

3 730,0

3 431,6

2014.

SMP-151 LLC

the settlement in change

50

14.

Reconstruction of Hatyrchinsky RMO

beds

95

4 000,0

3 680,0

2014.

Pakhtaobod tajlimlar plus LLC

the settlement in change

300


Namangan region

beds

140

2 100,0

1 932,0




from them:







15.

Reconstruction of Yangikurgansky RMO

beds

140

2 100,0

1 932,0

2014.

Agrokurilishtajmir LLC


Samarkand region

beds

425

7 850,0

7 222,0



the settlement in change

100



object

1




from them:







16.

Reconstruction of Ishtykhansky RMO

beds

240

4 450,0

4 094,0

2014.

7-sonli MKK LLC

17.

Reconstruction of Payaryksky RMO

beds

185

2 600,0

2 392,0

2014.

State of emergency of "Kuruvchi"

the settlement in change

100

18.

Reconstruction of city infectious diseases hospital in Samarkand

object

1

800,0

736,0

2014.

State of emergency of "Bakhodir-A"


Tashkent region

beds

200

8 500,0

7 820,0




from them:







19.

New construction of Parkentsky RMO

beds

200

8 500,0

7 820,0

2014.

JSC Uzspetsgazstroy


Khorezm region

beds

50

2 000,0

1 840,0



the settlement in change

150




from them:







20.

Reconstruction of regional skin and venereologic dispensary in the Khivan district

beds

50

2 000,0

1 840,0

2014.

State of emergency "Hamkor gas нефтурилиш"

the settlement in change

150


Tashkent

beds

246

13000

11960



21.

Reconstruction of city clinical hospital No. 1 in Shaykhantakhursky district

beds

46

4 000,0

3 680,0

2014.

State of emergency "Design тараккиёт"

22.

Reconstruction of city clinical hospital No. 1 in Yunusabadsky district

beds

100

2 500,0

2 300,0

2014.

State of emergency "Saykal Nur"

23.

Reconstruction of city clinical hospital No. 4 in Hamzinsky district

beds

100

6 500,0

5 980,0

2014.

Yuksak parvoz kurilish LLC

* Parameters will be specified by results of recalculation of residual amounts.

Appendix No. 2.4

to the Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of February 21, 2014 No. 36

The program of contract works for construction, reconstruction and capital repairs of the objects passing for 2014 by fund of development of material and technical resources of higher educational institutions

Name and location of object

Capacity of the educational case
(уч. places)

Объемы*:

Input term

Name of the contract construction organization

KV

including SMR


In total (6 objects)

1 700

63 153,3

44 211,2




from them:






free document

Full text available after Login.

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.