of March 19, 2015 No. 231
About approval of the List of work types (services) as a part of installation and construction works
According to subitem 23-11) of article 20 of the Law of the Republic of Kazakhstan of July 16, 2001 "About architectural, town-planning and construction activities in the Republic of Kazakhstan", I ORDER:
1. Approve the enclosed List of work types (services) as a part of installation and construction works.
2. To provide to committee on cases of construction, housing and communal services and management of land resources of the Ministry of national economy of the Republic of Kazakhstan in the established legislation procedure:
1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;
2) within ten calendar days after state registration of this order its direction on official publication in periodic printing editions and in information system of law of Ad_let;
3) placement of this order on Internet resource of the Ministry of national economy of the Republic of Kazakhstan.
3. To impose control of execution of this order on the supervising vice-minister of national economy of the Republic of Kazakhstan.
4. This order becomes effective after ten calendar days after its first official publication.
Minister
E.Dosayev
Approved by the Order of the Minister of national economy of the Republic of Kazakhstan of March 19, 2015, No. 231
1. Special works in soil, including:
1) device of the bases, including:
works on soil development, vertical layout, diggings of holes manually:
soil development by excavators in dredging, ditches, trenches, soil and roadside reserves in dump or embankment;
soil development by excavators with loading on rail or road transport and export;
development and movement of soil by the mechanized method and manually;
digging of holes by the mechanized method;
other works in case of soil development, vertical layout, backfilling;
works on the device of embankments and return fillings:
soil backfilling, including manually, with consolidation electro-or pneumotampers;
development and movement of soil in case of impact of hydroconstructions;
other works on the device of embankments and return fillings;
strengthening works:
paving of slopes stone and plates with the device of emphasis;
strengthening of drainage channels trays trenches, boards, boards and mats with the device of headstalls;
2) works on the device of the pile bases, tongue-and-groove barriers, anchors:
immersion of steel concrete piles;
immersion of the steel concrete tongue on mooring embankments;
immersion of steel piles in permafrost soil;
immersion and extraction of steel and rabbeted piles;
immersion of wooden and derevometallichesky piles with arrangement of tongue-and-groove row;
the device of bored piles with well-drilling and filling with concrete of hollow piles;
device of disassembly of rabbeted wooden crossing points;
installation of metal guides of frames and underwater tyazhy for blockage of the tongue;
device of piles;
other works on the device of the pile bases, tongue-and-groove barriers, anchors;
device of grillage and base plate;
works on consolidation of soil of natural bedding and device of soil pillows:
equalization of the territory of the irrigation site with rolling by the mechanized method;
soil consolidation by heavy tampers;
soil consolidation skating rinks and by gruntouplotnyayushchy machines;
soil consolidation manually easy tampers;
works on construction of lowering wells and caissons:
lowering of well with the mechanized soil development;
lowering of well manually;
other works on construction of lowering wells and caissons;
works on fixing of soil:
strengthening thermal soil;
cementation of the soil bases with blockage of injektor;
silicification and smolization of soil;
other works on fixing of soil;
3) works on water lowering, organization of superficial drain and drainage system:
device of water water and drainage ditches;
the water outflow device from trenches and ditches during the work in wet soil;
the device of the closed drainage;
immersion and extraction of iglofiltr and sprinkling by the filtering materials;
assembly and dismantle of the soaking-up collector;
construction of designs from stone and rocky breed;
backfilling by sand or slag using mechanisms;
the device of the spreading layers and the bases;
the device of the draining layers and filters from crushed stone (coal);
the device of drainage filters from gravel and sand;
stacking of porous ceramic plates of aerat;
the device of protective dikes in line with waterway;
other works on water lowering, organization of superficial drain and drainage system;
4) underwater and technical works and works on the sea shelf:
development and movement of soil by hydromonitor and floating dredges;
loosening and development of soil under water by the mechanized method and issue in dump or watercrafts;
loosening of soil under water jackhammers and divers;
the other hydromechanized and dredging works;
leveling and vibroconsolidation under water of horizontal beds divers;
movement of stone under water, dredging of stone and crushed stone from water;
lowering of metal and steel concrete covers of headstalls under water;
installation on the water area of mooring barrels on steel concrete anchors;
other underwater (diving) works;
5) works explosive:
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.