Document from CIS Legislation database © 2003-2025 SojuzPravoInform LLC

PRESIDENTIAL DECREE OF THE REPUBLIC OF BELARUS

of April 10, 2014 No. 156

About construction of high-voltage power lines and substations for issue of capacity of the Belarusian nuclear power plant

(as amended on 04-08-2021)

For the purpose of increase in energy security of the Republic of Belarus I decide:

1. Realize till January 1, 2019 the investment project "Construction of the NPP in the Republic of Belarus. Issue of capacity and communication with power supply system" (further - the investment project) according to the contract of June 8, 2012 No. 500/2012 (further - the contract) concluded between the Grodno republican unitary enterprise of power industry Grodnoenergo (further - RUP "Grodnoenergo") and the North Chinese electric project utility company under the Chinese electrical power engineering and consulting corporation (further - the Chinese company), with attraction of the soft consumer credit of Export-import Bank of China.

2. Determine:

2.1. the customer on construction of facilities within the investment project (further - objects), including subject to voluntary conveyance in economic maintaining the Vitebsk republican unitary enterprise of power industry of Vitebskenergo (further - RUP "Vitebskenergo") and the Minsk republican unitary enterprise of power industry Minskenergo (further - RUP "Minskenergo") according to part one of subitem 3.6 of Item 3 of this Decree, RUP "Grodnoenergo";

2.2. general contract organization on construction of facilities the Chinese company.

3. Determine that:

3.1. construction of facilities is performed step by step in parallel with development, conducting examination and approval in accordance with the established procedure of the necessary project documentation on each of stages of works on construction with simultaneous designing of the subsequent stages of the specified works;

3.2. materials on withdrawal of the parcels of land in permanent and (or) temporary use of RUP "Grodnoenergo" are drawn up in the course of performance of works of each of construction stages;

3.3. the construction is performed with the right of removal, change of objects of flora without implementation of the compensation landings and compensation payment of cost deleted, the replaced flora objects.

Document in Demomode!

Full text is available after Login

Login Signup

Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info

Effectively work with search system

Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system

Get help

If you cannot find the required document, or you do not know where to begin, go to Help section.

In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.

You also may open the section Frequently asked questions. This section provides answers to questions set by users.