of February 29, 2016 No. 114
About price fixation on the goods (works, services) made and (or) realized by the subject of the state monopoly in the field of the state town-planning inventory
According to Item 2 of article 38 of the Law of the Republic of Kazakhstan of July 16, 2001 "About architectural, town-planning and construction activities in the Republic of Kazakhstan", I ORDER:
1. Establish the goods prices (works, services) made and (or) realized by the subject of the state monopoly in the field of the state town-planning inventory according to appendix to this order.
2. To provide to committee on cases of construction, housing and communal services and management of land resources in the procedure established by the legislation:
1) state registration of this order in the Ministry of Justice of the Republic of Kazakhstan;
2) placement of this order on Internet resource of the Ministry of national economy of the Republic of Kazakhstan;
3) the direction of the copy of this order in printing and electronic type on official publication in periodic printing editions and information system of law of Ad_let within ten calendar days after its state registration in the Ministry of Justice of the Republic of Kazakhstan, and also in the Republican center of legal information within five working days from the date of receipt of the registered order for inclusion in reference control bank of regulatory legal acts of the Republic of Kazakhstan;
4) within ten working days after state registration of this order in the Ministry of Justice of the Republic of Kazakhstan submission to Legal department of the Ministry of national economy of the Republic of Kazakhstan of data on execution of the actions provided by subitems 1), 2) and 3) of this Item.
3. To impose control of execution of this order on the supervising vice-minister of national economy of the Republic of Kazakhstan.
4. This order becomes effective after ten calendar days after day of its first official publication.
Minister of national economy of the Republic of Kazakhstan
E.Dosayev
Appendix
to the Order of the Minister of national economy of the Republic of Kazakhstan of February 29, 2016 No. 114
|
№ payment order |
Name |
Unit of measure |
The price, tenge (excluding tax on value added) |
|
1 |
Preproject and project documentation |
object |
3 478 |
|
2 Materials of engineering and geodetic researches (topographical and executive shooting) 1 | |||
|
2.1 |
objects III (lowered) level of responsibility |
hectare |
6 480 |
|
2.2 |
the objects II (normal) level of responsibility which are not relating to technical difficult |
8 594 | |
|
2.3 |
the objects I (increased) and II (normal) level of responsibility relating to technical difficult |
10 916 | |
|
2.4 |
technologically difficult objects |
13 486 | |
|
Note: 1) reference of objects on levels of responsibility, are determined according to Rules of determination of general procedure for reference of buildings and constructions to technically and (or) technologically difficult objects (the order of the Minister of national economy of the Republic of Kazakhstan of February 28, 2015 No. 165). 2) the analysis of the provided materials on compliance to provisions of standard rates on maintaining the state town-planning inventory and carrying out engineering and geodetic researches, implementation of space binding in the automated information system of the state town-planning inventory (further – AIS GGK). 3) the order of registration is performed according to Rules of registration in the database of the state town-planning inventory of town-planning projects, preproject and project (project and estimate) documentation, and also objects of architectural, town-planning and construction activities (the order of the Minister of Regional Development of the Republic of Kazakhstan of June 16, 2014 No. 172/ODES). | |||
|
№ |
Name |
Unit measurements |
The price, tenge (excluding tax on value added) |
|
1 |
Issue from AIS GGK of data of the preproject and project documentation |
object |
1 222 |
|
2 |
Provision from AIS GGK of the scheme of placement of the actual arrangement of engineering networks, buildings and (or) constructions (vykopirovka) |
hectare |
12 217 |
|
3 |
Creation and issue of the cadastral plan of the approved town-planning projects (GP, PDP) |
object |
2 068 |
|
4 |
Provision of access to information resources through AIS GGK: |
Access one user (month) |
- |
|
4.1 |
to all information layers (open data) in borders: |
- | |
|
one settlement; |
1 560 | ||
|
settlement of republican value and capitals |
2 079 | ||
|
4.2 |
to one information layer in borders: |
- | |
|
one settlement; |
1 040 | ||
|
settlement of republican value and capital. |
1 560 | ||
|
Note: 1) the cadastral plan of the territory and the scheme from AIS GGK are provided in the dwg-formats or the SHP file in initial system of coordinates. The cost of production of schemes in SHP file format in initial system of coordinates is determined by the prices of this table with 1,2 coefficient; 2) the procedure for provision of data from AIS GGK is performed according to Rules of maintaining and submission of information and (or) data from the state town-planning inventory of the Republic of Kazakhstan (the order of the Minister of national economy of the Republic of Kazakhstan of March 20, 2015 No. 244); 3) information layers are determined according to the approved Regulating document by maintaining the state town-planning inventory (the order of the Chairman KDSZHKH MIIR RK of November 2, 2022 No. 201-HK); 4) provision of information and access to layers of AIS GGK is performed in compliance by the Law of the Republic of Kazakhstan "About the state secrets". | |||
|
№ of payment order |
Name of works |
Category of complexity 1, tenge/hectare (excluding tax on value added) | ||
|
1 |
2 |
3 | ||
|
1 |
Inventory count of underground and elevated communications in the built-up territories with scheduling of scale 1:500 |
29 167 |
45 350 |
77 152 |
|
2 |
Inventory count of underground and elevated communications in the vacant territories with scheduling of scale 1:500 |
6 962 |
12 420 |
17 124 |
|
Note: 1) characteristic of categories of complexity of inventory count: The built-up territories: 1 category settlements with simple situation / rare building, small amount of underground communications, railway lines, lawns with separate trees, traffic circulation and pedestrians weak; the intra quarter territories with building of simple configuration, rare network of underground and elevated communications, the small number of plantings and other elements of situation. 2 category settlements with situation of average complexity / average building, difficult configuration of the layout developed by network of underground and elevated communications, railway lines, lawns with trees, transport and heavy pedestrian traffic; the intra quarter territories with building of the simple configuration developed by network of underground and elevated communications, small amount of trees, or dense building with rare network of underground and elevated communications and large number of outdoor constructions, fences, trees. 3 category settlements with difficult situation, dense network of underground, land and elevated communications, railway lines, large number of lawns with trees, transport and pedestrian movement very intensive or towns with dense building, very difficult layout or the dispersed building in the mountain area (resort towns, the cities in mountains); the intra quarter territories with dense building of difficult configuration, large number of constructions, fences, trees, dense network of underground and elevated communications. Vacant territories: 1 category the flat area with quiet relief, places closed by the rare well-planned wood without underbrush or rather thin bush, slightly crossed by the beams and ravines isolated by hills and hills; quantity of contours insignificant; the open vskholmlenny area with the expressed large forms of relief with small quantity clearly the expressed contours; the open floodplain with small amount channel, the aged man and sleeves, the swamp easily passable; open sites of irrigation seasonal cultures with rare network of aryk. 2 category the flat area crossed by beams and ravines, covered with the wood in places with underbrush or dense bush, quantity of contours average; the vskholmlenny area with large forms of relief covered with rather thin wood without underbrush or bush, quantity of contours average; the open mountain area with relief of average complexity and small amount of contours. the floodplain is half-closed, partially boggy with small amount channel, the aged man and sleeves; swamp of average passability; half-closed sites of irrigation seasonal cultures with network of aryk and the flat territories occupied with gardens and vineyards. 3 category the flat or vskholmlenny area considerably crossed by beams and ravines, which grew with the dense wood with underbrush; the area which is completely covered with the boggy wood with blockages and windbreak, overgrown, boggy; desert areas with difficult relief; the zalesenny mountain area with irregular shapes of relief; the territories of gardens and vineyards on hillsides; the floodplain with difficult microrelief, completely overgrown, large number channel, the aged man and sleeves, boggy; swamp almost impassable; the closed sites of irrigation seasonal cultures (gardens) with dense network of aryk. 2) updating of infrastructure data is carried out according to the prices of this table; 3) as a result of entering into the database of the state town-planning inventory of graphical and attributive information (digitization) the digital electronic map of settlements of scale 1:500, containing information layers about the location of structures, improvement and all engineering and transport communications according to the approved Regulating document on maintaining the state town-planning inventory is created (the order of the Chairman KDSZHKH MIIR RK of November 2, 2022 No. 201-HK). | ||||
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.