of October 29, 2015 No. 311
About approval of Rules of technical railway operation of the Kyrgyz Republic
According to articles 10 and 17 of the Constitutional Law of the Kyrgyz Republic "About the Government of the Kyrgyz Republic", the Law of the Kyrgyz Republic "About regulatory legal acts of the Kyrgyz Republic", the order of the Government of the Kyrgyz Republic of September 15, 2014 No. 530 "About delegation of separate rule-making powers of the Government of the Kyrgyz Republic to number of state bodies of the executive authority", in pursuance of requirements of the Law of the Kyrgyz Republic "About rail transport" of July 9, 1998 No. 90, and also for the purpose of safety of the legal base and ensuring safe operation of rail transport in the Kyrgyz Republic, being guided by Regulations of the Government of the Kyrgyz Republic approved by the order of the Government of the Kyrgyz Republic of June 10, 2013 No. 341, I order:
1. Approve "Rules of technical railway operation of the Kyrgyz Republic".
2. To the state company "The Kyrgyz Temir to Zhol national company under the Ministry of Transport and Communications of the Kyrgyz Republic to accept this order to execution.
3. To impose control of execution of this order on the deputy minister of transport and communications of the Kyrgyz Republic Uyezbayev U. K.
Minister
A. Malabayev
Approved by the Order of the Ministry of Transport and Communications of the Kyrgyz Republic of October 29, 2015 No. 311
1. Rules of technical railway operation of the Kyrgyz Republic establish basic provisions on technical railway operation and operations procedure of workers of rail transport in case of their operation, the main sizes, regulations of content of the major constructions, devices and railway vehicles and requirements imposed to them, system of the organization of train service and the principles of the alarm system.
2. Concerning technical railway operation the Ministry of Transport and Communications of the Kyrgyz Republic (further the Ministry of transport) publishes instructions and instructions of Republican value, and the Kyrgyz railroad - the instructions and instructions determining work of its structural divisions.
All instructions and instructions relating to technical railway operation, constructions, devices and railway vehicles shall conform to requirements of these rules.
1.1. Fundamental obligations of workers of rail transport are requirements satisfaction in transportations of passengers, loads, baggage and cargo baggage in case of unconditional safety of movement and safety of the transported loads, baggage and cargo baggage, effective use of technical means, observance of requirements of protection of the surrounding environment.
1.2. Each worker connected with train service bears around the obligations responsibility for accomplishment of these rules and traffic safety.
Control of observance of Rules of technical operation by workers of rail transport is imposed on heads of the relevant divisions.
Violation of these rules by workers of rail transport involves responsibility according to the legislation of the Kyrgyz Republic.
1.3. Each worker of rail transport shall give stop signal to the train or the maneuvering structure and to take other measures to their stop in cases, life-threatening and to human health or traffic safety. In case of failure detection of constructions or devices, creating safety hazard of movement or pollution of the surrounding environment, the worker shall take immediately measures to barrier of the dangerous place and elimination of defect.
1.4. Workers of rail transport shall ensure safety of passengers, create it accommodation requirements, service culturally at stations, in trains, to be polite and precautionary in the treatment of all persons using services of rail transport and at the same time to demand from them accomplishment of the rules existing on rail transport.
1.5. Workers of rail transport shall keep according to the procedure workplace and entrusted technical means.
Workers of rail transport for whom the dress code and signs of distinction is established shall be in the uniform if for them the special production clothes are not established.
Each worker of rail transport shall follow rules and instructions for labor protection, fire safety, the health regulations and regulations, requirements of standards, metrological regulations and rules and other regulating documents established for the work performed by it. Responsibility for accomplishment of these rules and instructions is assigned to contractors and heads of the relevant divisions.
1.6. Are not allowed on locomotives, in cabins of control of motorvagonny trains, special self-propelled railway vehicles (autonomous cars, section cars, special railcars, railway and construction machines) and other mobile units, to the signals, shooters, devices, mechanisms and other devices connected with train service safety and also to rooms from where management of signals and such devices, persons who do not have access rights to them is made.
Manage locomotives, motorvagonny trains, special self-propelled railway vehicles (autonomous cars, section cars, special railcars, railway and construction machines) and other mobile units, signals, devices, mechanisms and other devices connected with train service safety and also have the right to throw switch only representatives on it workers during execution of service duties by them.
The workers of rail transport passing in accordance with the established procedure training can be allowed to control of locomotives, motorvagonny trains, special self-propelled railway vehicles (autonomous cars, section cars, special railcars, railway and construction machines) and other mobile units, signals, shooters, devices, mechanisms and other devices connected with train service safety only under observation and under the personal liability of the workers who are directly servicing these devices.
1.7. Persons going to rail transport to work connected with train service shall undergo professional training, and locomotive crews, train dispatchers, persons on duty on railway stations (further - the person on duty on the station), crews of special self-propelled railway vehicles, besides, professional selection, to pass tests and in subsequent periodically to be checked in knowledge:
Rules of technical railway operation of the Kyrgyz Republic (PTE) (are approved by the order Mintranskommunikatsy the KR of July 24, 2003 No. 12-69/RB);
Instructions on the alarm system on the railroad of the Kyrgyz Republic (ISI) (Mintranskommunikatsy the KR of May 23, 2007 No. 131) are approved by the order;
Instructions for train service and shunting work on the railroad of the Kyrgyz Republic (IDP) (Mintranskommunikatsy the KR of July 30, 2003 No. 203 (12 - 70/Republic of Belarus) is approved by the order;
The job descriptions and other documents establishing obligations of workers;
Rules and instructions for labor protection, health regulations and regulations;
Regulations on discipline of workers of rail transport of the Kyrgyz Republic.
All other workers shall know the general obligations of workers of rail transport provided by these rules, governed on labor protection, the health regulations and regulations, job descriptions and other documents establishing obligations of workers.
Workers of rail transport to whom according to the procedure of full load of the working day or combination of professions accomplishment of the subsidiary duties connected with train service is assigned shall be allowed to this work only after their testing in knowledge of the corresponding rules and instructions.
The list of positions and professions for which occupation workers are subject to the testing provided in this Item, amount of knowledge for each position (profession) and also procedure for carrying out testing in case of employment and periodic are established by the Ministry of transport.
Requirements to professional selection of locomotive crews, train dispatchers, persons on duty on stations, crews of special self-propelled railway vehicles are established by the Ministry of transport.
1.8. Persons going to work and the workers of rail transport who are directly connected with train service are subject obligatory preliminary, in case of revenues to work, and to periodic medical examinations in accordance with the established procedure.
According to the labor law of the Kyrgyz Republic of persons under 18 are not allowed to occupation of the following positions and professions which are directly connected with train service: drivers of locomotives, motorvagonny trains, autonomous cars and special railcars, railway and construction machines, cranes (crane operators) and their assistants, drivers of section cars and their assistants, firemen of engines in depot, train dispatchers, station dispatchers, dispatchers of shunting railway stations, dispatchers locomotive road, power dispatchers, dispatchers of car repair shed, dispatchers on regulation of the car park, persons on duty on railway stations, persons on duty on the park, persons on duty on travel, persons on duty on moving, station posts of centralization on duty, persons on duty on hump yards, operators in case of persons on duty on stations, operators in case of shunting dispatchers of railway stations, operators of hump yards, operators of posts of centralization, operators of Items of maintenance of cars, operators on traveling measurements and their assistants, operators of defektoskopny carts, conductors of cargo trains, originators of trains and their assistants, traffic controllers of speeds of movement of cars, signalmen, arrow posts on duty, acceptors of trains, roadmen, masters of pavements, masters tunnel, masters of structural divisions of the railroad in electric utility service, masters of Items of maintenance of cars, masters and workers on bezottsepochny repair of cars, inspectors of cars, inspectors-repairmen of the cars, foremen (exempted) on the current content and track repair and artificial constructions, inspectors of way and artificial constructions, servicemen of control and measuring cars, mounters of way (the third category above), chiefs (mechanics-foremen) of passenger trains, train electricians, conductors, mechanics of refrigerator trains (sections), electricians and electricians occupied on: repair and servicing of the equipment and communication devices; servicing and repair of devices of the alarm system, centralization and blocking; on repair and servicing of contact network, traction and transformer substations and high-voltage lines energized and at height.
1.9. Workers of rail transport shall keep entrusted property of the railroads and the transported loads.
2.1. Constructions and devices, the railroads shall contain in good repair.
The prevention of emergence of defects and providing long service life of constructions and devices, the railroads shall be the main thing in work of persons responsible for their content.
Workers are responsible for condition of constructions and devices, the railroads, it is direct servicing them, and heads of the companies under which authority these constructions and devices are.
The specified workers according to job responsibilities everyone on the site shall know service regulations and condition of constructions and devices, to systematically check them and to provide high quality of content, maintenance and repair with observance of metrological rules and regulations and requirements of standards for constructions and devices of rail transport.
2.2. Constructions, devices, mechanisms and the equipment shall correspond to the approved project documentation and specifications. On the main constructions, devices, mechanisms and the equipment there shall be technical data sheets containing the major technical and operational characteristics.
The devices, mechanisms, the equipment and railway vehicles including delivered to rail transport of the Kyrgyz Republic are subject to obligatory confirmation of conformity according to requirements of technical regulations of the Customs union.
Constructions and devices, the railroads shall conform to the requirements providing the omission of trains with the largest established speeds: passenger - 140 km/h, refrigerator - 120 km/h, cargo - 90 km/h. On specific sites of the railroad according to the list approved by road management the differentiated speeds are established.
Additional requirements to constructions and devices on sites of the railroads where passenger trains handle speed more than 140 to / h, are established by the Ministry of transport.
Modification of designs of constructions and devices is allowed only with the permission of the officials having the right to approve the project documentation on these constructions and devices.
Classification, reserve maintenance periods and regulations of content of the main constructions and devices are established according to protocols of meetings of Council for rail transport of the State Parties of the CIS.
Technical instructions and standard engineering procedures for maintenance, repair and content of constructions and devices affirm the Kyrgyz railroad.
2.3. Again built and reconstructed lines, constructions, devices and buildings shall be accepted in continuous operation by inspections according to acceptance procedures in operation finished with construction of facilities of rail transport.
Again constructed and reconstructed constructions and devices of the railroad become effective only after approval of the regulating documentation establishing procedure for their work providing labor protection and traffic safety (technical and administrative acts, instructions for work), and also checks of knowledge of the specified documentation by the workers servicing these constructions and devices.
In case of construction and commissioning of infrastructure facilities of rail transport their assessment is performed according to requirements of technical regulations of the Customs union.
2.4. Constructions and structures of general network, railway roads and railroad side tracks from the station of adjunction to the territory of industrial and transport enterprises shall meet requirements of dimension of the approach of structures of C established by the interstate standard.
Constructions and devices, the railroads which are in the territory and between the territories of industrial and transport enterprises shall meet requirements of dimension of approach of structures of Cn established by the interstate standard.
Dimensions of C and Cn shall be observed during the designing, construction, reconstruction of the railroads, railroad side tracks, constructions and devices on them, in case of electrification and construction of the second ways, and also at all operated constructions and devices which are earlier given to the specified dimensions.
Features of application of dimensions of C and Cn in case of new construction and reconstruction of the railroads, constructions and devices, requirements to the existing constructions and devices constructed on old regulations and the dimensions of C which are not meeting the requirements and Cn, procedure for test of dimensions of constructions and devices and elimination of oversized places are provided by the instruction for application of dimensions of approach of structures.
When planning reorganization of the existing constructions and devices which are not meeting the requirements of dimensions of C and Cn, first of all the objects which are not providing the omission of perspective railway vehicles of dimensions Tnp and Shopping centers, and also loads shipped on zone dimension shall be considered.
It is not allowed to break dimensions of constructions and devices, the railroads when carrying out any repair, construction and other work.
2.5. The distance between axes of ways on stages of two-acceptable lines on direct sites shall be at least 4100 mm.
On three-acceptable and four-acceptable lines the distance between axes of the second and third ways on direct sites shall be at least 5000 mm.
The distance between adjacent axes of adjacent ways at railway stations (further - stations) on direct sites shall be at least 4800 mm, on the minor ways and ways of cargo areas - at least 4500 mm. In case of arrangement of the main ways at stations extreme with the permission of the chief of the railroad the distance between them 4100 mm is allowed. The distance between axes of the ways intended for direct freight handling from the car in the car can be allowed by 3600 mm.
Horizontal distances on curve sites between axes of adjacent ways and between axis of way and dimension of approach of structures on stages and stations are established by the instruction for application of dimensions of approach of structures.
2.6. The load shipped on open railway vehicles (taking into account packaging and fixture) shall be placed within the established regulations of dimensions of loading.
Loads which cannot be placed on open railway vehicles within loading dimensions are transported according to the procedure established by rules.
For check of correctness of cargo placement within the specified dimension in places of mass loading (on railroad side tracks, in sea and river ports, at stations of overload) dimensional gate are established.
The loads unloaded or prepared for loading about the way shall be laid and fixed so that the dimension of approach of structures was not broken.
Loads (except the ballast unloaded for traveling works) with height up to 1200 mm shall be from outside side of head of extreme rail not closer than m 2,0, and with bigger height - m 2,5 is not closer.
3.1. All elements of railway track (road bed, the upper structure and artificial constructions) on durability, stability and condition shall provide safe and smooth train service with the speeds established on this site.
3.2. Placement and hardware of structural divisions of the railroad on traveling facilities, traveling machine stations and other companies of traveling facilities shall provide accomplishment of necessary works on content and repair of railway track, constructions and devices for accomplishment of given sizes of train service with the established speeds.
3.3. Requirements to designs of constructions and devices, the procedure for their content and operation which is not listed in these rules are established by the Ministry of transport.
Plan and profile of way
3.4. The railway track concerning radiuses of curves, interfaces of straight lines and curves, the steepness of biases shall correspond to the approved plan and profile of the line.
3.5. Stations, traveling and obgonny Items, shall be located on the horizontal platform; their arrangement on biases not more abruptly than 0,0015 is in some cases allowed; and in difficult conditions not more abruptly 0,0025.
In especially difficult conditions on traveling and obgonny Items of all types, and with permission the Ministry of transport on relay stations, longitudinal or semi-longitudinal types on which maneuvers and uncoupling of the locomotive or cars from structure and separation of the connected trains are not provided allows biases more 0, within the station platform. Biases of more 0,0025 when lengthening priyemootpravochny ways at the existing stations are allowed also in especially difficult conditions with permission by the Ministry of transport, on condition of taking measures against spontaneous leaving of cars or structures (without locomotive), but not more abruptly than 0,010 in both cases.
For prevention of spontaneous leaving of cars or structures (without locomotive) out of limits of useful length of ways at stations, traveling and obgonny Items the longitudinal profile of again constructed and reconstructed priyemo-dispatch ways on which uncoupling of locomotives from cars and production of shunting transactions is provided shall be designed concave (yamoobrazny) outline with identical marks of heights on the ends of useful length of ways.
The device of safety deadlocks, security arrows, the dumping boots dumping funnymen, the dumping arrows, and also use of stationary devices for fixing of cars shall be provided in necessary cases for the prevention of spontaneous exit of cars on other ways and routes of acceptance, departure of trains respectively.
In all cases of arrangement of stations, traveling and obgonny Items on biases start-off conditions from the place of trains of the established weight regulation and condition of deduction of trains shall be provided with auxiliary brakes of locomotives.
3.6. Stations, traveling and obgonny Items, and also certain parks and exhaust ways shall be located on direct sites. In difficult conditions placement them on curves with a radius at least 1500 m is allowed. In especially difficult conditions reduction of radius of curve to 600 m, and in mountain conditions - to 500 m is allowed.
3.7. The plan and profile of the main and station ways, and also the railroad side tracks belonging to the railroad shall be exposed to recurring tool inspection.
The organization of works on tool verification of the plan and profile of ways, production of the corresponding technical documentation, and also creation of large-scale and schematic plans of stations is assigned to track maintenance of the railroad with attraction for accomplishment of these works of design institutes, project and surveying and project and estimate groups and accomplishment of these works according to the program approved by the chief of the railroad. Structural divisions of the railroad on traveling facilities shall have:
drawings and descriptions of all constructions and devices of traveling facilities which are available in structural division, and also the conforming standards and regulations;
large-scale and schematic plans of stations, longitudinal profiles of all main and station ways, hump yards, and also railroad side tracks where engines of the railroad address.
Longitudinal profiles of hump yards, the subhump and pro-thinned-out exhaust ways on marshaling, local and freight stations are checked at least once in three years, on other extent of station ways of all stations the profile is checked at least once in 10 years. The longitudinal profile of the main ways at stations and stages is checked during capital and average repair of ways. By results of checks specific terms of works on bearing of profiles are established. Sites of way on which the reconstruction of way and other works causing change of the plan and profile is made are checked by contractors after their termination with submission to structural division of the railroad on traveling facilities, and at stations as well to the station commander of the corresponding documentation.
In case of construction in the territory of the station of new objects, the expansion or transfer existing any organization performing such works transfers to the chief of structural division of the railroad on traveling facilities and the station commander the executive documentation determining object binding to the existing development of the station, in accordance with the established procedure.
Road bed, upper structure of way and artificial constructions
3.8. Width of road bed on top on direct sites of way shall correspond to the upper structure of way. On the existing lines before their reconstruction width of road bed is allowed at least: on single-line lines - 5,5 of m, two-acceptable - m 9,6, and in the rocky draining soil is at least: on single-line lines - 5,0 of m, two-acceptable - m 9,1. The minimum width of roadside of road bed shall be m 0,4 from each party of way on top.
On curve sites with a radius less than 2000 m the road bed broadens on the established regulations.
The sites of road bed which are not meeting the requirements listed in this Item are brought into accord with them in planned procedure in case of accomplishment of the capital and strengthened average of track repairs strengthened.
For again under construction rail lines and the second ways, and also the reconstructed lines width of road bed on top and parameters of ballast prism shall conform to requirements construction technical regulations.
The brow of road bed in places of spill of waters shall be at least 0,5 m higher than the maximum height of setup of wave in case of strong winds.
3.9. The nominal size of width of track between internal sides of heads of rails on direct sites of way and on curves with a radius of 350 m and more - 1520 mm. Track width on more abrupt curves shall be:
in case of radius from 349 m to 300 m 1530 mm;
in case of radius from 299 m and less than 1535 mm.
On sites of rail lines and ways where complex replacement of assembled rails and sleepers was not made, allowed on direct and curve sites of way with a radius more than 650 m the nominal size of width of track of 1524 mm. At the same time on more abrupt curves width of track is accepted:
in case of radius from 650 m to 450 m 1530 mm;
in case of radius from 449 m to 350 m 1535 mm;
in case of radius from 349 m and less than 1540 mm.
Disclaimer! This text was translated by AI translator and is not a valid juridical document. No warranty. No claim. More info
Database include more 50000 documents. You can find needed documents using search system. For effective work you can mix any on documents parameters: country, documents type, date range, teams or tags.
More about search system
If you cannot find the required document, or you do not know where to begin, go to Help section.
In this section, we’ve tried to describe in detail the features and capabilities of the system, as well as the most effective techniques for working with the database.
You also may open the section Frequently asked questions. This section provides answers to questions set by users.